My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement for Preliminary Engineering Services - City to Reimburse the Railroad Costs for Engineering – Norfolk Southern Railway Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Agreement for Preliminary Engineering Services - City to Reimburse the Railroad Costs for Engineering – Norfolk Southern Railway Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:33:50 AM
Creation date
9/10/2020 10:02:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITEM F - Signal & Electrical Changes <br />(see attached summary) <br />Material: <br />Labor: <br />Purchase Services: <br />Other: <br />NET TOTAL - ITEM F <br />ITEM G - Track Work <br />Material: <br />(see attached summary) <br />Labor: <br />(see attached summary) <br />Additive: <br />(see attached summary) <br />Purchase Services: <br />(see attached summary) <br />D&C (Lump Sum): <br />(see attached summary) <br />NET TOTAL - ITEM G <br />ITEM H - T-CUBED <br />Lump Sum (see attached summary) <br />NOTES <br />1. For all groups of CONTRACT employees, the composite labor <br />surcharge rate used in this estimate (including insurance) <br />is 185.81%. Self Insurance - Public Liability Property <br />Damage is estimated at 16.00%. Work will be billed at <br />actual current audited rate in effect at the time the <br />services are performed. <br />2. For all groups of NON -CONTRACT employees, the composite <br />labor surcharge rate used in this estimate (including <br />insurance is 78.59%. Self Insurance - Public Liability <br />Property Damage is estimated at 16.00%. Work will be <br />billed at actual current audited rate in effect at the <br />time the services are performed. <br />s. An appucaDie salvage items aue me lieparlment wlll De <br />mane avanaDle LO IL aL Lne IODSILe loI ILS QISDOSAI. <br />4. The Force Account Estimate is valid for one (1) year <br />after the date of the estimate (07/23/2020). If the work is <br />not performed within this time frame the Railway may <br />revise the estimate to (1) include work not previously <br />indicated as necessary and (2) reflect changes in cost <br />to perform the force account work. <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.