My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Sewer and Manhole Rehabilitation Proj No. 118-093 - Inland Water Pollution Control, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 3 - Sewer and Manhole Rehabilitation Proj No. 118-093 - Inland Water Pollution Control, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 9:51:33 AM
Creation date
9/10/2020 9:51:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IPR Great Lakes, LLC <br />7100 Huron River Dr. <br />Dexter, MI 48130 <br /> <br />7/21/2020 <br />Sue E. Doudrick, P.E. <br />Assistant City Engineer <br />City of South Bend <br />Please review the attached pricing for acceptance to remove; line item 1 New 48” Doghouse Manhole- 30’ <br />depth, from the scope of work on Project No: 118-093, CSO018 Sewer and Manhole Rehabilitation. This will <br />be replaced with: <br />Description: Bypass Adjustments Unit QTY Price <br />Adjusted Bypass LS 1.00 $ 193,560.00 <br /> <br />Net Change Order Total $ 193,560.00 <br />This change order is requested to save time on the project, reduce cost to the city, and minimize impacts <br />to the neighborhood. <br /> <br /> <br />Alec Heard <br />Director of Project Management <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.