Laserfiche WebLink
a <br /> APPENDIX A <br /> PROJECT DESCRIPTION <br /> The Project consists of the design, acquisition and installations of certain additions, extensions <br /> and improvements to the Sewage Works, including, but not limited to: <br /> 1. Diamond Avenue Separation—Sewer separation improvements along Diamond Avenue <br /> from Vassar Avenue to approximately Euclid. <br /> 2. East Bank Separation Phase 4—Sewer Separation improvements for combined Sewage <br /> Overflow ("CSO") separation along the east bank of the St. Joseph River within the City. <br /> 3. Wastewater Treatment Plant digester improvements. <br /> 4. Green Design and Low Impact Design projects recommended in the"South Bend Long <br /> Term Control Plan Optimization"Report. <br /> 5. Preparation of CSO Long-Term Control Plan Designs of the City. <br /> 6. Making any and all improvements related to and contemplated by the CSO Long-Term <br /> Control Plan of the City. <br /> 7. Make any and all additional improvements related to the foregoing. <br /> A-1 <br />