My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Charles Martin Parking Lot Proj No. 120-051 - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Charles Martin Parking Lot Proj No. 120-051 - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 9:22:01 AM
Creation date
9/10/2020 9:21:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(i)Quote shall include cost to adjust any rim elevations at any existing drainage structures, <br />as needed, to ensure positive drainage to all existing drainage structures <br />b.Quote should include any necessary patching after the milling operation is complete <br />(i)Assume 10% of the parking areas will need further patching <br />c.Place a tack coat between old and new asphalt as per City and INDOT standards <br />(i)Include tack coat for any patching areas as well <br />d.Place a 1.5”lift of surface asphalt, adheringto City and INDOT standards for hot mix asphalt <br />(non QA/QC) <br />e.Re-stripe parking areas, including handicapped spots and gore areas as necessary <br />(i)Site visit with Building Manager will be coordinated with winning quote to determine final <br />stripinglayout <br />2.TheContractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br />Version 2/14/2020Page -6Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.