Laserfiche WebLink
(i)Quote shall include cost to adjust any rim elevations at any existing drainage structures, <br />as needed, to ensure positive drainage to all existing drainage structures <br />b.Quote should include any necessary patching after the milling operation is complete <br />(i)Assume 10% of the parking areas will need further patching <br />c.Place a tack coat between old and new asphalt as per City and INDOT standards <br />(i)Include tack coat for any patching areas as well <br />d.Place a 1.5”lift of surface asphalt, adheringto City and INDOT standards for hot mix asphalt <br />(non QA/QC) <br />e.Re-stripe parking areas, including handicapped spots and gore areas as necessary <br />(i)Site visit with Building Manager will be coordinated with winning quote to determine final <br />stripinglayout <br />2.TheContractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br />Version 2/14/2020Page -6Public Works Quote <br />