My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2020 River Lights Project - Martell Electric LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - 2020 River Lights Project - Martell Electric LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 9:20:20 AM
Creation date
9/10/2020 9:20:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
light, ten times setback distance, and greater uniformity of luminance around the rim of the <br />chalices. Additionally, color can be controlled independently along each linear foot of product, <br />creating smooth color transitions. These luminaires are provided with cables that directly <br />connect to the power supply/data bridge in each Chalice Control Enclosure, potentially <br />simplifying installation. The provided cable, plugged into the luminaire, could be strapped to the <br />18” extension mounting arm, and possibly strapped to conduit on the bridge coping, on its way <br />to the Control Enclosure entry cable grips, then connected directly to the CBX-ST DMX/RDM <br />power supply. No independent DMX cable is required. Each Wall Washer luminaire has an <br />independent home run connection inside the CBX-Star system. As the control enclosure interior <br />data connections have been assembled by the Control Contractor, the EC does not have to <br />engage DMX idiosyncrasies, with the wall washers. <br />2. The specification package includes a Luminaire/Power-supply/Luminaire Lead cable <br />Schedule, Luminaires BOM summary, and labeled specification sheets. <br />3. With the exception of the prewired control devices, enclosures, and control system integration, <br />the EC is responsible for all electrical materials, electrical connections and install labor in <br />addition to providing the lighting BOM, as described. The EC is also responsible for all <br />electrical and attachment engineering and related approvals. Shakespeare Lighting Design <br />LLC recommends that all luminaires be addressed and tested prior to install and has <br />experience and the tools necessary to field address these Lumen Pulse DMX products. <br />4. Once installed, and in corporation with the Control Contractor (who designed, built and <br />maintains the River Lights control system), the system will be tested, trouble shot, and <br />delivered in working order, ready to be aimed and then programmed by Shakespeare Lighting <br />Design. Aiming of the linear wall washers takes place after dusk. Assuming reasonable access <br />to the adjustable 18” extension arms, anticipate a 4-hour session with an EC electrician to <br />provide aiming for the 15 lumninaires. Programming will be performed after dark over two <br />nights, estimated 4 hours for each session. An EC electrician familiar with the new installation <br />needs to be present to address any potential component/system failures. <br />E. Bill of lighting materials <br /> <br />1. See Appendix A <br /> <br />2. This is a list of primary lighting materials that the electrical contractor must procure. <br /> <br />3. This list only lists primary specialty lighting needed and does not include the materials necessary <br />for installation. The electrical contractor will provide all other materials for the installation and <br />operation of the lighting included herein. <br /> <br />4. System must work with the already installed River Lights, thus equals will not be accepted on all <br />product involved in the control and programming of lighting. <br /> <br />5. Equals for the lighting products will be considered from the following manufactures and will be only <br />accepted if with written authorization from the City and the Lighting Design consultant. <br />a. Color Kinetics <br />b. Acclaim <br />c. Lumen Pulse <br /> <br />6. Control boxes (CBX-ST) and associated power supplies (CBX100) as listed on BOM, must be <br />immediately ordered and shipped to the controls integrator upon notice to proceed. The controls <br />integrator will assemble internal components of the control boxes and electrical contractor will <br />install per Design Sheet 102. <br />a. Controls Integrator <br />(i) Mike Brubaker <br />Associated Controls & Design <br />6850 Guion Rd <br />Indianapolis, IN 46268 <br />877-298-3961 <br />Version 2/14/2020 Page - 7 Public Works Quote <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.