Laserfiche WebLink
the former Powell House, a non-functioning Comfort Station, a swing set/sIide, the Sunken (Rose) Garden, the island, and the <br />Works Progress Administration retaining wall and a bridge to the island. <br />Leeper Park Central features include: concrete stairs on embankment, a well house, the Edward B. Reynolds fountain, Lavender <br />Labyrinth, memorials including trees, stones, and plaques. The Commission approved river overlook is under construction at <br />this time. <br />Leeper Park West features include: backdrop of the former baseball diamond, tennis courts, a recreation building, a parking lot, <br />an odor garden, and raised vegetable gardens with adjoining paths. <br />ALTERATIONS: <br />Throughout <br />COA 2019-0402 approved conditionally 1. Lighting, with condition of staff approval 2. Sign locations, not sign design 3. <br />Furnishings and Garden Ornaments with exception of the backed, non -custom metal benches around the fountain to <br />be the backless benches, only 4. Planting Design. <br />COA 2019-0109 approved conditionally I. Pedestrian circulation improvements and pathways, with condition of staff approval <br />over memorials and landscaping 2. New playground 3. Studebaker Fountain and associated gathering place 4. <br />Removal of Duck Pond, with condition that "reseed the lawn" is not approved but instead requires a plan be submitted <br />to the Commission to interpret the Duck Pond in another way 5. Concept of a formal river overlook with final design <br />to be approved by Commission. <br />RMEs and COAs for tree trimming, removal, and installation have been approved under the guidance of the City Forester. <br />RMEs and COAs for sidewalks have been approved. <br />Leeper Park East <br />RME 2017-0410 approved "This permit covers only Phase I of the project - drilling a pilot well. Phase II (dnlltng the actual <br />well and trenching in the piping) will require a separate COA." <br />COA 2017-0306 approved installation of new stage and new audience seating, landscape beautification and lighting for stage, <br />new benches with concrete pad closer to stage. <br />RME 2016-1013 approved removal of bmsh and planting of willow tree near Rose Garden. <br />The Sunken (Rose) Garden with reflecting pool and statuaries were removed in the 1960s. RME 2017-1012 approved <br />installation of two small concrete pads with two benches adjacent to Rose Garden. Benches to match those approved <br />through COA 2015-0302A. COA 2017-0228 approved installation of 8' wide crushed limestone walkway connecting <br />the Michigan Street sidewalk with the Sunken Garden, bounded by two, 42" wide flower beds, and irrigation system <br />for entire garden. COA 2015-1002 approved "Within an existing concrete curb (that will remain), the landscaping bed <br />will be enhanced to mimic the reflecting pool formerly within its boundary. New flower beds will be defined using <br />new soil, compost and plantings. A walkway of crushed limestone will pass through the beds. Additional half circle <br />beds will be added to the north and south of the concrete curb. The "three -fates" statues will be repaired pro-bono by a <br />local artist, and then placed into the center of the "pool" bed, where they were originally, in the same back -to -back -to <br />back style; and the one remaining "cherub" will be nearby, on a footing. That "cherub" will be duplicated from the <br />original, and the new statue also placed nearby in the "pool" bed." COA 2015-0504A approved restoration of Rose <br />Garden and gravel path system by volunteers. <br />COA 2015-0908 approved "Bartlett Street Roundabout Project Description (I 14-032b). Project to construct a roundabout at <br />Bartlett and Michigan Street approved per all diagrams and documents submitted. Encroachment to Leeper Park East <br />will be limited to 0.57 acres and all trees removed will be replaced within the park." <br />The Garden of Fragrance no longer exists, but the signage remains. RME 2015.0422 approved "Rebuild/restack low retaining <br />wall currently located in Leeper Park next to Garden for the Blind. Matching flagstone has been donated by Knepp <br />Sand and Stone and Old Fort Building Supply; and follows material estimate made by a representative of the SB Parks <br />Department. The restacking of the flagstone wall will also require digging away the dirt around loose blocks and <br />backfilling afterwards." <br />COA 2011-1103A approved "Replace the existing lift station on the south side of the North Pumping Station driveway and <br />relocate it to the north side of the driveway. Screen the new location with landscaping and plantings. Rehabilitate the <br />Garden of Fragrance Braille marker and boulder monument and install new sidewalks and decorative paving. All per <br />diagrams, plans and plant palette submitted and approved." <br />Wading Pool was filled in and the pergola removed, 1970s. <br />Circa 1862 vernacular Powell House <br />Navarre Cabin moved to Leeper Park, 1904; relocated, 1916; relocated again to present site, 1954. Restored 2005-2006. <br />Zoo closed and structures used for animals demolished, 1913. <br />Leeper Park Central <br />COA 2019-0806 approved the "Construction of a new river overlook in Leeper Park", with the conditions regarding the <br />installation of the railings at the overlook, the bench designs, lighting at the overlook, and railings along the stairs. <br />COA 2017-0213B approved "Addition to Leeper Park of a garden labyrinth, 40'-0" diameter center, 80'-0" diameter outer circle <br />per submitted plans. Includes removal and replacement of existing trees specified in plans; removal of DAR <br />memorial tree NOT PERMITTED." <br />