Laserfiche WebLink
713 W LaSalle AvenueAddress:02 - Exterior - HouseUnit: <br />Exterior - HouseLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 1 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 219 Lead Abatement <br />Foundation - Sides B, C and D <br />LBPS01 1.00 DUBARE SOIL--SOIL REPLACEMENT $2,800.00 $2,800.00 <br />Dampen dry bare soil. Remove and dispose of the top 4" of soil <br />in the areas indicated on the plan or noted otherwise. Disposal <br />of removed soil must be in accordance with state and EPA <br />guidelines. Bring in clean topsoil and spread evenly to replace <br />all removed soil. Fertilize and sod area. Install a 3' high barrier <br />of marking tape or string on 1' x 1' stakes to establish lawn. <br />Bare Soil along Drip line of Residence - Sides A, B & C <br />LBPW01 32.00 EAWINDOW ABATEMENT $772.32 $24,714.24 <br />Field measure, order and install a historically similar, wood, <br />replacement style, Energy Star Rated, Argon filled, Low E <br />coated glass, one-over-one window. Weight wall cavities, if <br />applicable, are to be insulated with expanding foam or blown-in <br />cellulose. Remaining window components to be stabilized and <br />encapsulated utilizing a lead encapsulant, per manufacturers <br />instructions. Owner to be supplied with 5-year warranty. <br />Windows and components have deteriorated lead-based paint. <br />Containment Required per 24 CFR 35.1345 <br />713 - Apt 1 <br />Windows: L2, L3, L4, L5, L6, L7, L8, L9, L10, L11, L12, L13, <br />L16, L18 <br />713.5 - Apt 2 <br />Windows: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 16, 17, 18, 19, 20, <br />21 <br />LBPW10 1.00 EAWINDOW - STRIP PAINT & REINSTALL $875.00 $875.00 <br />After establishing any required floor containment with <br />polyethylene sheeting, wet mist, remove window sashes <br />necessary to remove all LBP, package in plastic and send <br />window to off-site stripper or location to be stripped onsite. All <br />remaining paint on jambs, parting beads, trough, or other <br />friction impact surfaces shall be stripped of paint. Mist any <br />remaining defective paint with water to the point of saturation. <br />Scrape all loose paint with a draw scraper. Wash with <br />detergent solution, rinse, allow to dry and HEPA vacuum any <br />paint chips, dust and debris. Reinstall stripped and reglazed <br />window sashes. Prime and top coat entire window unit/trim with <br />white acrylic latex extior paint. <br />Prior to repainting, Project Manager must inspect to verify all <br />LBP was removed. Failure to notify may result in having to <br />remove paint to verify that all LBP is removed. <br />Window 14 <br />Location Total:$84,748.69 <br />Page 6 of 25