Laserfiche WebLink
Address: 713 W LaSalle (Reinspection) Avenue Unit: 02-Exterior-House <br />Location: <br />Spec# <br />1 • Exterior - House <br />Spec <br />,Wt«Sf; 0 CeWngfftoofSF; 0 <br />Quantity Units Unit Price Total Price <br />Trade: 219 Lead Abatement <br />accordance with manufacturer's directions. <br />Spot prime and top coat with premium acrylic latex. Re-install <br />door on hinges. Install hardware as necessary. All stripped <br />surfaces must be inspected by Project Manager / Owner <br />Representative prior to painting/encapsulation. <br />713-Apt 1 <br />Door, Casing, Jamb and Threshold - Side D - To Room 2 <br />Door Jamb, Casing and Threshold - Side A - To Room 1 <br />Door, Jamb, Casing and Threshold - Side C - To Room 6 <br />713.5-Apt 2 <br />Door and Casing - Side A - To Room 1 <br />Door, Jamb, Casing and Threshold - Side C - To Room 6 <br />LBPENCA ELASTOMERIC ENCAPSULANT <br />After establishing any required floor containment with <br />polyethylene sheeting, prepare surface by degreasing and <br />deglossing. Apply any recommended primer and roll out a <br />liquid, polymer, elastomeric encapsulant to create a continuous <br />seal over the surface in accordance with manufacturer's <br />specifications. Product must be pre-approved prior to <br />installation. Use the required number of coats and coverage <br />rate of elastomeric to guarantee a minimum 20-year <br />manufacturer's warranty. Repair substrate as necessary to <br />ensure proper adhesion and performance. <br />Columns - All Sides <br />Beams - All Sides <br />Ceiling - Sides A and C (Porch) <br />Newel Posts - All <br />Siding - All Sides and Elevations - Replace Deteriorated Wood <br />as Needed <br />Soffit and Fascia - All Sides and Elevations <br />Railing - Sides A and D <br />Window Casings - Window L17 <br />Trim - All <br />All Exterior Wood Components associated with windows 13,14 <br />(not friction / impact surface that will be removed), & 15 <br />Apply an exterior grade latex paint as a final coat. Owner <br />approval of final color required. <br />LBPPR01 REMOVE PAINT- CHEMICAL <br />Prepare area and protect adjacent areas not being stripped in <br />accordance with manufacturer's directions. Provide adequate <br />worker protection. Apply chemical stripper and any <br />recommended cover sheet in accordance with manufacturer's <br />specifications. Neutralize and rinse surface in accordance with <br />manufacturer's directions. Collect residue and rinse water in 55 <br />gal drums. Provide disposal of drums. Chemical must be <br />pre-approved by Project Manager. Following paint removal, the <br />Project Manager must inspect to verify completion. Upon <br />approval by Project Manager, prime and apply coat of paint to <br />owner's selection of standard paint colors. If repainting occurs <br />prior to Project Manager approval, Contractor shall remove all <br />paint again. <br />5,140.00 SF job $19,400 <br />315.00 SF job $1,500 <br />Page 5 of 24