My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contribution in Aid of Construction Agreement - Disconnect and Reconnect Electrical Feed Miami Basin – Indiana Michigan Power Co.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Contribution in Aid of Construction Agreement - Disconnect and Reconnect Electrical Feed Miami Basin – Indiana Michigan Power Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:50:18 AM
Creation date
8/26/2020 9:21:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contribution -In -Aid -Of -Construction Agreement <br />For Electric Distribution Service <br />OWM'S'00000493698 Work Request 4 77022658 Date, 6/29/2020 <br />CusL<xr€er NamaiSouth Bend Waste Water Tariff; GS-Sar <br />9 1. 0 E J. P., EIAN J.) P L) <br />SOUTH BEND, IN <br />Project Description: The Customer has requested the installation of electric distribution faciliLles <br />(hereinafLer referred to as "Basic Service") as Eollows: Relocate existing sing]e, <br />phase 120/240V 200A underground service per City A SB Waste WaLcr Dept, <br />Indiana MAchigan Power Company - IN (hereinafter rererred to as "Company") agrees to Cut existing <br />underground service, hard dig 10 feet, splice 35' of 110AI UT, abandon 10' of exisLing underground service, <br />wansfet existing meter N3000 to now cabinet. <br />Customer agrees to reimburse AEP for the relocation of the existing service per the Terms & Conditions of <br />Service (see attached) <br />1. custypplevenue Credit - Customer hereby agrees that the following electrical load and/or housing units will A� <br />installed A) &Lhin three (3) months from completion of extension unless stated otherwLse in the comments above; or B) <br />wiLhin six (6) yeais from compieLion of extension if customer is developing a subdivision or manufactured housing <br />park. <br />NUMBER OF SUBDIVISION LOTS 0 <br />CSC i3ER OF LOTS USED To DE.ERM- ktEVET 11E 001 <br />House Size Base Load Geothermal & esistance AOHP <br />P r' r <br />jASHP(# i0nits'') ETS(# units) unit - ) <br />0 - - ------- <br />COMMERCIAL INDUSTRIAL <br />Demand kW Month1v kWH 7 Lowd Factor <br />Based on the custmner's preceding rep resenration, the ConTany estimates the 2-1/2 year Yevenue to be 0320.33. <br />Customer agrees to pay to the Company the potentially refundable amount of $0.00, which is the difference between <br />the Company's cost of installing the necessary facilities and the estdmated revenue credit. Tn addition, the. <br />customer agrees to pay as non-infundable amount of $530.38, kur any work requested that exceeds what is required to <br />piuvide adequate service. <br />Tobal amoumt due including both the refundable and the pion -re fundalble amount is $530.38 <br />Payment shall be made prior to the start of Company's construction ob facilities. <br />A. Recalculated Re nne - It the customer has not installed or contracted for the installation of the electr&,, <br />equipment as Mated in paragraph 13, Lhen the Company shalt recalculate the estimaLed revenue. <br />If the recalculated revenue is less Lhan the Company's cost of lac ilities, then the customer shall, within thirty <br />(30) ddYS Of ceceiv&g an invoice from the Company, pay to Cmapany as aid to construction, the difference between <br />the estimated revenue and the Company's cost of the tacilities . The fact that the customer may no longer be <br />associated with or have a properly interest in the project served under this agreement does not release the customer <br />from this obligation, <br />3. Cus-omer Refund - It the customer made an aid to construction payment, then the customer shall, after the number <br />of services used in the original revenue calculation has been instaLled, receive a refund for any additional <br />permanent customers utilizing the same line extension wiLhLn six (6) years from compieLion of the extension. <br />Refund, WIL be made for each additional purownent customer equal to 2-1/2 times the estimated annual revenue, less <br />Lhe estimated cost of service diop or laterals and metering equipment required to serve the new permanent <br />custower(s). The Mal of all refunds or allowances shall not exceed the total payment made by the cusLomei, <br />Refunds will be mado ones customer has notifiad the Company of any new cusLomers that are added to this extension. <br />4. UndergKpVRd Service <br />a. The customer shall provide, <br />at no cost <br />Lo the company, the <br />necessary right of way for the <br />underground electric..,. <br />service and shall make the right <br />of way accessible <br />to the company's <br />equipment. The owner shall <br />remove all. <br />obstacles, grade Lhe r1ghL of way <br />to within 4" <br />of finished grade, <br />and provide continuing access <br />to the Company for <br />expansion, operation, and maintenance <br />of all elect <br />do service Eacilitles.Soedinq <br />and restoration <br />or replacement A <br />all Lrees, 2hrubs,and landscape ing,shall <br />be thp <br />rpspnnsibiliky of <br />the customer. <br />b. The Compaiitr may provide tho necessary excavation, trenching and backlill- and shali install the electrical <br />Conductors and related facilities. The custome, may elect to do all trenching and backfiLl in order to reduce <br />company charges for installing underground service. ALI nrenchinq and backfili must be done in accordance Kith <br />Company specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.