Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TnbmmEsbjobhfEftjho'Sfqbjs.Tbnqtpo'Pwfsmppl <br />229.174B2 <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />5.6.317.34.31 <br />DATE INITIATED:BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Beefetbojubsztfxfsjotubmmbujpoevfupfyjtujohdpogmjduxjuiofxtupsntfxfs/Bmtpjodmveft <br />jodsfbtftjotfwfsbmmjofjufntevffsspstjoqmboofervboujujftdbmdvmbujpot/ <br />Attachments: (List documents support changerequired) <br />CsfblepxopgDPjufnt <br />233-569/:2 <br />o <br />Amount of Increase / Decrease: $____________________ <br />Categories (Pick One): <br />1/11 <br />Scope of Work <br />Previously approved Change Order(s): $___________________ <br />o <br />Differing Site Conditions, Changed Conditions <br />65/74 <br />Current Percent of Change: ____________________ % <br />Conflicted Specifications and Drawings <br />Failed Materials <br />457-749/:2 <br />New Total Amount: $____________________ <br />o <br />Error <br />Omission <br />65/74 <br />Total Percent of Change: ____________________ % <br />o <br />Final Quantity Adjustment <br />_______________________ <br />778.716.628.553113'752.17.713.61:.54:112 <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDEDBY: <br />EboKpoft7.21.31 <br />Project Inspector (Print Name)(Signature)(Date) <br />REVIEWED BY: <br />1802403131 <br />UpzWjmmb <br />Construction Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />TvfFmmfoEpvesjdl8024031 <br />Engineering Project Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />LbsbCpzmft <br />City Engineer (Print Name)(Signature)(Date) <br /> <br />