My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Copper and copper alloys should be stored in a clean dry location away <br />from curing concrete and uncured masonry. Cover in a waterproof <br />material and vent to prevent condensation. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 MATERIALS AND GAUGES <br /> <br />A. Where sheet metal is required, and no material or gage is indicated on the <br />Drawings, provide the highest quality and gage commensurate with the <br />Conditioning Contractors National Association (SMACNA). <br /> <br />2.2 COATED COPPER WALL FLASHING <br /> <br />A. <br />B. Acceptable manufacturers for the coated copper flashing: <br />1. Polytite: 1-800-776-0930. <br />2. Advanced Building Products: Ceprcote 1-800-252-2306 or equal <br />approved by the Architect / Engineer. <br /> <br />2.3 COOPER ROOF FLASHING <br /> <br />A. Provide minimum 20 oz. copper flashing as required by clay tile roofing <br />manufacturer. <br /> <br />2.4 NAILS, RIVETS, AND FASTENERS <br /> <br />A. Use only copper rivets, copper coated nails, and Architect / Engineer approved <br />washers in connection with the coated copper flashing. <br /> <br />2.5 OTHER MATERIALS <br /> <br />A. Provide other materials, not specifically described but required for a complete <br />and proper installation, as selected by the Contractor subject to the approval of <br />the Architect / Engineer. <br /> <br />PART 3 - EXECUTION: <br /> <br />3.1 SURFACE CONDITIONS <br /> <br />A. Examine the areas and conditions under which work of this Section will be <br />performed. Correct conditions detrimental to timely and proper completion of the <br />work. Do not proceed until unsatisfactory conditions are corrected. <br /> <br /> <br />3.2 WORKMANSHIP <br /> <br />A. General: <br /> FLASHING AND SHEET METAL <br />07600-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.