My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
by the City of South Bend Department of Public Works. <br />VIII.LEGAL RELATIONS <br />A.Prevailing Specifications:2020, INDOT Standard Specifications Section 107 <br />B. Additions: <br />1.The Owner, where mentioned in these documents, is the City of South Bend. The <br />Engineer, where mentioned in these documents, is Jones Petrie Rafinski, Corp. <br />2.The Contractor shall apply for and obtain any and all required permits for the work from <br />local, state, and federal agencies and shall comply with permit requirements, including the <br />St. Joseph County / City of South Bend Building Department. <br />3.If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the <br />Contractor shall provide the Engineer with proof that the Contractor is duly licensed, <br />qualified and registered with the Secretary of State of Indiana to engage in business within <br />the State of Indiana. <br />4.The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The <br />Owner reserves the right to immediately terminate the public work project awarded should <br />the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and <br />such violation shall result in the forfeiture of Contractor’s performance bond to the Owner. <br />IX.SUBMITTALS <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 106 <br />B. Additions: <br />1.Submit four (4) copies or an electronic version of the submittals for all equipment or <br />materials used in this project to the South Bend Department of Public Works for approval. <br />All submittals must be delivered within 7 calendar days from the notice to proceed. <br />2.The Department of Public Works will review and return two (2) copies or an electronic <br />version of the submittals within five (5) working days. <br />3.The review of the submittal information by the Department of Public Works is to facilitate <br />the satisfactory acceptance of the equipment. This review shall neither relieve the <br />contractor from the responsibility for deviations from the Specifications, nor from errors and <br />omissions in the shop drawings or literature. Parts found not meeting the requirements of <br />these Specifications shall be removed, repaired or replaced at no cost to the OWNER. <br />4.Submittals shall include complete manufacturer’s descriptive information and shop <br />drawings for all the parts furnished under this contract. <br />5.Upon completion of project, the Contractor will supply one (1) conformed set of all <br />submittals to the City of South Bend. <br />X. PROSECUTION AND PROGRESS <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Sec. 108 <br />B. Additions: <br />Version 7/01/2016 Special Provisions - 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.