Laserfiche WebLink
1 <br />Elicia Feasel <br />From:Kaley Kubiak <kaleylkubiak@gmail.com> <br />Sent:Wednesday, August 19, 2020 3:22 PM <br />To:Elicia Feasel <br />Cc:Adam Toering; Ross Van Overberghe <br />Subject:Re: Pictures and Paragraph- Thanks! <br />Attachments:IMG_4555.jpeg; Screen Shot 2020-08-19 at 3.08.56 PM.png <br />Hi Elicia,  <br />Thank you so much for the information and all of your work on this application!  <br />1.Attached is the site plan with the brick details and measurements. Sorry about that‐‐ I may have forgotten to send it/ <br />it got buried but here it is! The hand‐drawn was traced over the satellite image so it matches up if oriented correctly. Let <br />me know if this is acceptable. <br />2.Here is the link to the specific brick used‐‐‐ https://www.beldenbrick.com/onlinecatalog/brick‐colors/red‐ <br />bricks/00002160/belcrest‐560 <br />3.Here is a link to the specific Royal Building Products siding‐‐‐ <br />         https://www.royalbuildingproducts.com/sites/rbp/files/2020‐ <br />01/ep_marketsquare_productbrochure_us_2020.pdf  <br />4.They stated that this would be about the price for both replacement and new wood as needed, considering damage to <br />the old siding, layers of paint, holes, etc. They stated that this quote would remain about the same/increase for the lp <br />smartside siding as an alternative. This would be for the siding and the fascia, soffit, as needed. Much of it needs repair <br />as it is falling down in many areas on the second story. <br />5.The A&M was for both repair and new where was needed. <br />6.We are just going to side around the chimney <br />Hopefully this fulfills the rest of the application requirements but feel free to reach out if you have any other questions!  <br />Thanks again, Elicia! Have a great day!   <br />Kaley Kubiak   <br />On Wed, Aug 19, 2020 at 1:59 PM Elicia Feasel <efeasel@southbendin.gov> wrote:  <br />Hi Kaley –   <br />Update: I met with Legal about the partially retroactive COA and have been authorized to issue the Administrative  <br />Approval based on the Standards and existing circumstances for the vinyl and also for the porch. However, there are a  <br />couple questions we had to complete the COA for the Commission’s paperwork.  <br />In assembling the COA paperwork and after going back through our email exchanges, I don’t find a site plan (per <br />the checklist on page 3 of the application), please forgive me if I’ve missed it. The need for a site plan is to show <br />dimensions for the new brick porch in context with the property. Hand drawn on a satellite view from <br />GoogleMap will work. <br />In clicking the link for Rose Brick, it doesn’t direct me to the specific brick that has been selected. Please either <br />send a link to specification or a pdf. Thank you for noting the mortar!