Laserfiche WebLink
REGULAR MEETING MAY 12, 2020 97 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />akrueger@walshkelly.com <br />Bid was signed by Dustin Hillary <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />I <br />Division Al Total <br />$79,299.00 <br />Division A2 Total <br />$63,840.00 <br />Division Bl Total <br />$82,611.00 <br />Division B2 Total <br />$24,490.00 <br />Division B3 Total <br />$35,608.00 <br />Division C1 Total <br />$38,722.00 <br />Division D1 Total <br />$51,456.00 <br />Division D2 Total <br />$43,480.00 <br />Base Bid plus Alternates <br />$419,506.00 <br />PREMIUM CONCRETE SERIVES. INC <br />712 Richmond St. <br />Elkhart, IN 46516 <br />rbeeker@premiumeoncreteonline.com <br />Bid was signed by Robert Jones <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />I: G <br />Division Al Total <br />$96,106.00 <br />Division A2 Total <br />$63,454.00 <br />Division B1 Total <br />$66,534.50 <br />Division B2 Total <br />$23,080.00 <br />Division B3 Total <br />$32,728.00 <br />Division C1 Total <br />$35,971.50 <br />Division D1 Total <br />$43,899.00 <br />Division D2 Total <br />$39,653.00 <br />Base Bid plus Alternates <br />$401,426.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the <br />above bids were referred to Engineering for review and recommendation. <br />OPENING OF BIDS — BENDIX ESPORTS ARENA — PROJECT NO. 119-106C <br />(HOTEL/MOTEL TAX_) <br />This was the date set for receiving and opening of sealed electronic bids for the above referenced <br />project. The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was <br />found to be sufficient. No bids were submitted. Conference Technologies, Inc. submitted a letter <br />of Request for Information regarding the bid and a letter of no bid. The Board noted this email <br />address is only for receiving bids and the questions should have been submitted to the project <br />engineer prior to the bid opening. Ms. Maradik made a motion to send the letter of Request for <br />Information and no bid for review to Century Center. Mr. Molnar seconded the motion, which <br />carried by roll call. Ms. Kara Boyles, City Engineer, clarified there were no bids received for this <br />project. <br />APPROVE CHANGE ORDER NO. 1 — HYDRANT RELOCATION QUOTE PROJECT NO <br />120-021 (SSDA TIFF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Selge Construction Co., Inc., 2833 S. II'h. St., Niles, MI, 49120, indicating the contract <br />amount be increased by $16,856.79 for a new contract sum, including this Change Order, in the <br />amount, not to exceed, $62,726.79. Mr. Gilot noted the engineer explained in a memo that this <br />large increase was due to differing site conditions. Upon a motion made by Ms. Maradik, <br />seconded by Mr. Molnar and carried by roll call, the Change Order was approved. <br />