My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
First Amendment to PSA - Plan Preparation to Remove Damaged Vault Western Ave – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
First Amendment to PSA - Plan Preparation to Remove Damaged Vault Western Ave – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:58:53 AM
Creation date
7/29/2020 9:26:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated January 31, 2020. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: January 31, 2020 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: American Structurepoint, Inc. <br />d. Project: Structural Inspection and Repair Design for Vault roof at 1201 Western <br />Avenue, South Bend, Indiana <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: Structural <br />design and preparation of drawings in order to fill in the vault located at 1201 Western in <br />accordance with Option A presented in our report dated March 20, 2020. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: Design of vault repair, associated calculations, and preparation of design <br />drawings, herein designated Phase 200. <br />C. The responsibilities of Owner are modified as follows: Review drawings and <br />calculations submitted for review by the Engineer in a timely manner such that the <br />scheduled dates noted in section e. are not impeded. <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />1. An amount equal to Engineer's Direct Labor Costs times a factor of 1.0 for <br />services of Engineer's employees engaged on the Project, plus reimbursable <br />expenses, and Engineer's consultants' charges, if any. <br />2. The total Phase 200 compensation for services and reimbursable expenses is <br />not to exceed $8000.00. <br />e. The schedule for rendering services is modified as follows: <br />1. Repair drawings and calculations will be submitted for BOPW review by July <br />24, 2020. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.