Laserfiche WebLink
From:Gregory McGowan <br />To:david walorski <br />Cc:Kyle Silveus (ksilveus@southbendin.gov); Toy Villa; jeremy zalas NIC <br />Subject:Riverbank stabilization approval <br />Date:Tuesday, June 9, 2020 12:09:00 PM <br />Dave- <br />Funding has become available to complete the riverbank stabilization, so we would like for NIC to <br />proceed with that work. The funding that’s being provided is based on the following estimate: <br />Clear Vegetation from Banks = $640 LS <br />Topsoil – 75 cys at $48.75/cyd = $3,656.25 <br />Non-vegetated coir log – 100 LFT @ $43.55/ft = $4,355 <br />Erosion Control Blanket 200 sys at $10.28/syd = $2,056 <br />Native Seeding - $3890/lb in bid, specs are 46 lb/ac, 200 sys (0.041 Ac) = 2 lbs = $7,780 - $1,945 <br />Native seeding in job already = $5,835 <br />Estimate Total = $16,542.25 <br />Please let me know if you have any issues or questions regarding this request. In the meantime, I will <br />prepare Change Order documents for your signature. <br />Thank you, <br />Greg McGowan <br />Construction Inspector <br />Department of Public Works <br />Division of Engineering <br />Phone: 574-235-9001 <br /> <br />