My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - VPA Parking Lot Security Gates - Custom Fence Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - VPA Parking Lot Security Gates - Custom Fence Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 9:05:27 AM
Creation date
7/29/2020 9:05:19 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. The Contractor shall verify the locations of all utilities by contacting Indiana811 by calling 811 (in <br />Indiana) or 1-800-382-5544 (outside of Indiana), or via www.indiana811.org, at least two (2) <br />working days, not counting Saturdays, Sundays or federal and state holidays before proceeding <br />with construction. It shall also be the Contractor’s responsibility to contact any other utility that is <br />not contacted by Indiana811 and verify the utility locations. <br />2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, <br />etc. in order to assure that all utilities that need to be replaced or relocated can be done with a <br />minimum disturbance to service. The Contractor shall also be responsible for coordinating <br />schedules with the various utilities such that they can proceed with their relocation work as <br />efficiently as possible. <br />3. If the odor of natural gas is detected in a work area at any time during the course of work, the <br />Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also <br />immediately notify the residents of adjacent properties. The Contractor shall advise the residents <br />to evacuate their homes immediately if the odor is present within the dwelling. <br />4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the <br />Contractor at no additional cost to the City or the Owner of the system. <br /> <br />XVI. MAINTENANCE OF TRAFFIC <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Sections 105 & 801 <br />B. Additions: <br /> <br />1. Maintenance of traffic during construction shall conform to the “Indiana Manual on Uniform Traffic <br />Control Devices” and the City of South Bend Design and Construction Standards. <br />2. The attached “Traffic Closure Request” form is to be used for any lane restrictions or closures and <br />required to be filled out and sent to the Department of Public Works <br />3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner <br />that traffic on existing streets is unrestricted throughout the Project. The Project Manager shall <br />approve the method of traffic control. No construction equipment, vehicles, materials, supplies or <br />temporary facilities shall be left unattended in the right-of-way of any street or left parked overnight <br />without proper marking and lighting. <br />4. After the award of the contract and before beginning the work, the Contractor shall submit his/her/its <br />proposed schedule of operations for the review of the Project Manager. The schedule of operations <br />as reviewed by the Project Manager shall be maintained at all times. <br />5. There will be no direct payment for this work. <br /> <br />XVII. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to furnish and install swinging vehicle gates within the City of South Bend. <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br /> <br />XVIII. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />B. Additions: <br /> <br />1. The plans consist of 5 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br /> <br /> <br /> <br />Version 2/14/2020 Page - 5 Public Works Quote <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.