Laserfiche WebLink
L <br />EXHIBIT 2 <br />DLZ INDIANA, LLC <br />STANDARD FEE STRUCTURE <br />ENGINEERING /ARCHITECTURAL <br />2012 <br />Activity <br />Gode <br />Employee Classification <br />2012 <br />Hourly Rate <br />1 <br />Principal <br />$220.00 <br />49 <br />Division Manager (Chief Engineer) <br />$185.00 <br />50 <br />Department Manager <br />$160.00 <br />55 <br />Registered Land Surveyor <br />$130.00 <br />21 <br />Project Manager <br />$140.00 <br />214 <br />Senior Right-of-Way Engineer <br />$140.00 <br />330 <br />Electrical Engineering Specialist <br />$150.00 <br />53/58 <br />Engineer III/Architect III/Landscape Architect III/ <br />Planner III/Scientist III/Geologist III <br />$125.00 <br />52/57 <br />Engineer II/Architect II/Landscape Architect II/ <br />Planner II/Designer III/Scientist II/Geologist II <br />$115.00 <br />51/56 <br />Engineer I/Architect I/Landscape Architect I/ <br />Planner I/ Designer II/Scientist I/Geologist I <br />$90.00 <br />28 <br />Designer I <br />$80.00 <br />29 <br />Technician <br />$65.00 <br />147 <br />Construction Administrator <br />$105.00 <br />152 <br />Construction Observer <br />$85.00 <br />43 <br />Clerical <br />$55.00 <br />Rates are subject to revision on January 1, 2013. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S:\ DeptW dministration \ClericaNtATES\2011 Hourly Rates.doc <br />