Laserfiche WebLink
9.Furnish one electronicereview copy of the Preliminary Design Phase documents and any <br />other deliverables to Owner within 45calendar days of authorization to proceed with this <br />phase, and review them with Owner. Within 14calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />10.Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner’s comments, as appropriate, and furnish to Owner copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within calendar days after receipt of Owner’s comments. <br />B.Engineer’s services under the Preliminary Design Phase will be considered complete on the date <br />when the revisedPreliminary Design Phase documents, revisedopinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03Final Design Phase <br />A.After acceptance by Owner of the Preliminary Design Phase documents, revisedopinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner-directed modifications or changesin the scope, extent, character, <br />or design requirements of or for the Project, and upon written authorization from Owner, Engineer <br />shall: <br />1.Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed andfurnished by Contractor. <br />2.Provide technical criteria, written descriptions, and design data for Owner’s use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3.Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4.Perform or provide the following additional Final Design Phase tasks or deliverables: none <br />5.Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documentswithin 30 calendar <br />days after receipt of Owner’s review comments of the Preliminary Design Documents. <br />Within 14days of receipt, Owner shall submit to Engineer any comments and, subject to <br />the provisions ofParagraph 6.01.G, instructions for revisions. <br />6.Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit onefinal digital copy of the bidding documents, a <br />revised opinion ofprobable Construction Cost, and any other deliverables to Owner within <br />14calendar days after receipt of Owner’s comments and instructions. <br />Page2 <br />(Exhibit A –Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />