My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Engineering Services for CSO 018 Backwater Valve Replacement – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Engineering Services for CSO 018 Backwater Valve Replacement – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 11:29:59 AM
Creation date
7/15/2020 11:29:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br />The terms “substantially complete” and “substantially completed” as applied to all or part <br />of the Work refer to Substantial Completion thereof. <br />31.Supplier – A manufacturer, fabricator, supplier, distributor, materialman, or vendor <br />having a direct contract with Contractor or with any Subcontractor to furnish materials or <br />equipment to be incorporated in the Work by Contractor or Subcontractor. <br />32.Total Project Costs – The sum of the Construction Cost, allowances for contingencies, <br />and the total costs of services of Engineer or other design professionals and consultants, <br />together with such other Project-related costs that Owner furnishes for inclusion, <br />including but not limited to cost of land, rights-of-way, compensation for damages to <br />properties, Owner’s costs for legal, accounting, insurance counseling and auditing <br />services, interest and financing charges incurred in connection with the Project, and the <br />cost of other services to be provided by others to Owner pursuant to Exhibit B of this <br />Agreement. <br />33.Work – The entire construction or the various separately identifiable parts thereof <br />required to be provided under the Contract Documents. Work includes and is the result of <br />performing or providing all labor, services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating all materials and equipment <br />into such construction, all as required by the Contract Documents. <br />ARTICLE 8 – EXHIBITS AND SPECIALPROVISIONS <br />8.01Exhibits Included: <br />A.ExhibitA, Engineer’s Services. <br />B.ExhibitB, Owner’s Responsibilities. <br />C.ExhibitC, Payments to Engineer for Services and Reimbursable Expenses. <br />D.ExhibitD, Duties, Responsibilities and Limitations of Authority of Resident Project <br />Representative. <br />E.ExhibitE, Notice of Acceptability of Work. <br />F.ExhibitF, Construction Cost Limit.NOT INCLUDED <br />G.ExhibitG, Insurance. <br />H.ExhibitH, Dispute Resolution.NOT INCLUDED <br />I.ExhibitI, Limitations of Liability. <br />J.ExhibitJ, Special Provisions. <br />K.Exhibit K, Amendment to Owner-Engineer Agreement.NOTINCLUDED <br />Page 15 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.