My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Pinhook Water Treatment Plant Improvements – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to PSA - Pinhook Water Treatment Plant Improvements – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:43:31 AM
Creation date
7/15/2020 11:22:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 24C873A9-FOOD-4C59-8176-7913603C3AO1 <br />2. The schedule for rendering services is modified as follows: <br />Exhibit A, Engineer's Services, Paragraph A1.08 <br />Notice to Proceed <br />One (1) week from executed agreement <br />Kickoff Meeting/Site Visit <br />Scheduled one (1) week from Notice to Proceed <br />Review of Existing <br />Information <br />One (1) week after receipt from Owner <br />Basis of Design Memo <br />Three (3) weeks after Information Review <br />Preliminary Design <br />submittal <br />Four (4) weeks after revision of Basis of Design <br />Memo per Owner review comments <br />oV1Vni„cVol Q!jia 1�1VVoll <br />�(,1cccl Sc�cno l <br />" g Vtis o.Plc 4.( ...EcLIS ifter lc v4 ss lti o leiVadti'la <br />P�(:)-n i2g1 (_)wtic1rr lrrccicw coaamlc(1tc. <br />Final Design Asspsvmcc <br />Phase <br />Begin One (1) week after Contractor Selection FoiiF <br />Fcv 1c-* co1�1lacle l�I1 <br />�(,I iillg <br />�(egr4l o (2)..-weeks ..'44eIl"...f:evision 4, F41,1l [r)esign <br />Construction Administration <br />Begin after <br />11:::1::llrrl:l4 d <br />........................................ <br />RFIs <br />Address within three (3) business days of receipt <br />Submittal Review <br />Return within seven (7) calendar days of receipt <br />Walk-through <br />Upon substantial completion of the Work <br />3. Other portions of the Agreement (including previous amendments, if any) are modified as follows: <br />8 0. K Lxx i1 Nt K., A la1cticl 1c11t to (_)wticr Ltig: ticcr A greca lent NOT INGL dI)L <br />Exhibit C Paragraph C2.01.A.1 <br />l:fl, Final Design Ass.:�sv111.c. Phase $34,200 <br />Page 3 <br />(Exhibit K Attachment 1 —Amendment to Owner -Engineer Agreement, Modifications) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.