My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Sewer & Manhole Rehabilitation Western Ave. - Inland Waters Pollution Control
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 1 - Sewer & Manhole Rehabilitation Western Ave. - Inland Waters Pollution Control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 11:01:07 AM
Creation date
7/15/2020 11:01:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Tfxfs'NboipmfSfibcjmjubujpo <br />229.1:42 <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />:02102:802503131 <br />DATE INITIATED:BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />GpvoeefufsjpsbufetfxfstpoXftufsoBwfuibuoffefemjofeupqsfwfoudpmmbqtf/ <br />Bmtp-3TfxfsQjqfsvotxfsfgpvoeupcfuifjodpssfdutj{fjouifgjfme/ <br />Attachments: (List documents support changerequired) <br />Dpousbdupsqsjdjoh/ <br />81-249/11 <br />Amount of Increase / Decrease: $____________________ <br />Categories (Pick One): <br />1 <br />Scope of Work <br />Previously approved Change Order(s): $___________________ <br />Differing Site Conditions, Changed Conditions <br />3/36 <br />Current Percent of Change: ____________________ % <br />Conflicted Specifications and Drawings <br />Failed Materials <br />4-2:5-765/61 <br />New Total Amount: $____________________ <br />Error <br />Omission <br />3/36 <br />Total Percent of Change: ____________________ % <br />Final Quantity Adjustment <br />_______________________ <br />753.1732.526/53.16)VujmjuzFyqfotf* <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDEDBY: <br />KptiFinfs210:02: <br />Project Inspector (Print Name)(Signature)(Date) <br />REVIEWED BY: <br />Construction Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />TvfFmmfoEpvesjdl7041031 <br />Engineering Project Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />City Engineer (Print Name)(Signature)(Date) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.