4.00
<br />
<br />
<br />20.00
<br />900.00 300.00 370.00
<br />4,320.001,365.001,440.005,692.507,543.801,637.608,311.201,642.207,420.005,405.003,120.007,920.002,272.501,900.00
<br />
<br />48,200.0022,050.0043,020.0025,200.0032,340.0072,720.0016,520.0010,162.8022,200.0022,100.0024,657.5010,200.0023,112.0075,189.0044,800.00
<br />
<br />102,915.00133,161.00236,715.20146,153.70967,000.00 206,000.00
<br />
<br />
<br />1,173,000.00
<br />Item TotalItem Total
<br />$ $ YYY
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $ $ $ $ $
<br />2.101.00 1.20 0.54 2.25 0.54 0.89 0.24 6.90 1.801.00 0.80 2.25
<br />
<br />
<br />27.0075.1070.3070.0090.0074.0071.0070.0095.00
<br />Walsh & Kelly, Inc.Walsh & Kelly, Inc.
<br />
<br />455.00660.00160.00720.00150.00300.00295.00185.00260.00115.00660.00140.00
<br />
<br />48,200.0024,657.5010,200.00
<br />102,915.00
<br />Unit PriceUnit Price
<br />$$ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ Page 1 of 1
<br />$ $ $ $ $ $ $ $ $
<br />$ $
<br />BID TABULATION
<br />Project No: 120-030
<br />2020 Contractor Paving
<br />2.000.40
<br />
<br />For Bids Due: May 26, 2020
<br />900.00 300.00 370.00 390.00
<br />1,200.002,100.001,350.005,692.507,543.801,637.608,311.201,642.207,950.005,640.003,600.002,272.501,300.00
<br />
<br />34,784.1022,471.0010,278.4023,625.0057,360.0014,700.0030,300.0016,520.0010,162.8018,045.0019,720.0014,300.0011,000.0023,112.0076,512.7574,240.00
<br />
<br />
<br />114,138.00215,912.00150,207.75769,273.35 220,317.65 989,591.00
<br />
<br />Item TotalItem Total
<br />YYY
<br />$ $
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $ $ $ $ $
<br />Inc.Inc.
<br />
<br />1.80 0.100.100.542.250.540.890.246.901.80 0.100.102.25
<br />
<br />64.2468.5072.2575.0060.1572.2575.0065.00
<br />
<br />120.00400.00300.00150.00300.00150.00300.00295.00185.00232.00120.00300.00232.00
<br />
<br />34,784.1022,471.0014,300.0011,000.00
<br />Unit PriceUnit Price
<br />Rieth Riley Construction Co., Rieth Riley Construction Co.,
<br />$ $ $ $ $ $ $ $ $ $ $ $ $
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />
<br />$ $ $ $
<br />$ $
<br />5.16
<br />
<br />
<br />25.80
<br />900.00 300.00 400.00
<br />5,600.003,000.002,700.006,957.501,288.002,380.007,420.003,525.002,340.005,400.002,777.504,700.00
<br />
<br />73,762.1673,762.1622,050.0035,850.0012,600.0022,050.0050,500.0019,600.0015,056.0011,176.0017,315.0015,000.0043,775.0011,960.7111,960.7132,100.0068,835.00
<br />
<br />158,525.00204,880.00145,530.00944,982.61 164,800.00315,824.08
<br />
<br />
<br />1,260,806.70
<br />Item TotalItem Total
<br />$ $
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
<br /> $ $ $ $ $
<br />
<br />2.50 1.290.600.802.750.800.700.50
<br />
<br />35.0065.0070.0070.0075.0010.0050.00
<br />Engineer's EstimateEngineer's Estimate
<br />
<br />450.00300.00500.00150.00300.00350.00200.00515.00
<br />$2.50$1.29$0.60$2.75
<br />1,000.00
<br />$65.00$70.00$75.00
<br /> $450.00$235.00$515.00
<br />73,762.1673,762.16
<br />Unit PriceUnit Price
<br />$11,960.71$11,960.71
<br />$ $ $ $ $ $ $ $ $ $
<br />$ $ $ $ $ $ $ $ $ $ $ $ $ $
<br />$ $
<br />$
<br />LSLSLFLFLFLFLFLFLFLF
<br />SYEAEAEAEAEAEAEAEASYLFLF
<br />LSLS
<br />SYEASYSY
<br />UnitUnit
<br />TONSTONSTONSTONSTONSTONS
<br />TONSTONSTONSTONS
<br />1139612114
<br />20495685471220
<br />160315478101238300106320
<br />3152207925301840105939001010
<br />634102100018820139703463012840
<br />QuantityQuantity
<br />Base Bid + Alternate No. 1 Total
<br />Scott Kreeger, Engineer I
<br />DescriptionMaintenance of TrafficMobilization and DemobilizationMilling, Up to 1.5"Compacted Aggregate, No. 73HMA for PatchingTack CoatTraffic Detector Loops ReplacementJoint Adhesive,
<br /> SurfaceAdjust Manhole to GradeAdjust Water Valve Structure to GradeAdjust Inlet to GradePavement Message Markings, Thermoplastic, White, Lane Indication ArrowPavement Message Markings,
<br /> Thermoplastic, White, Turn and Through Lane-Use ArrowPavement Message Markings, Thermoplastic, White, Bicycle and ArrowPavement Message Markings, Thermoplastic, White, "ONLY"Line, Thermoplastic,
<br /> Solid, White, 4"Line, Thermoplastic, Solid, White, 6"Line, Thermoplastic, Solid, Yellow, 4"Line, Thermoplastic, Broken, Yellow, 4"Grooving for Pavement Markings, 4"Transverse Marking,
<br /> Thermoplastic, Solid, White, 24"Concrete Curb Replacement (Undistributed)Concrete Curb Ramp, InstallationTotalDescription Maintenance of TrafficMobilization and DemobilizationMilling,
<br /> Up to 1.5"HMA for PatchingTack CoatJoint Adhesive, SurfaceAdjust Manhole to GradeLine, Thermoplastic, Solid, White, 6"Concrete Curb Ramp, RemovalConcrete Curb Ramp, Installation TotalBid
<br /> BondWBE/MBE FormNon-Collusion AffadavitI hereby certify that the above truly and accurately represents quotes received for this project on May 26, 2020
<br />123456789123456789
<br />1011121314151617181920212223242526101112
<br />Item No.Item No.
<br />Base BidAlternate No. 1
<br />
<br />
|