My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 11-03-00
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2000
>
RM 11-03-00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:41:04 PM
Creation date
10/9/2012 4:36:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W11 <br />Structural <br />Joist & deck. Exposed trusses <br />$43,000 <br />Roofing- <br />1 -ply EPM roof <br />$37,000 <br />Fire Protection <br />Sprinkling <br />$12,600 <br />Electric- <br />service to both spaces, power <br />$83,000 <br />to neon entrance and ext. neon <br />lights, and exterior patio lighting <br />Mechanical <br />HVAC- exposed spiral ducts. <br />$114,000 <br />Roof top units, new air units <br />in atrium <br />Glass <br />Windows and Doors- <br />$47,000 <br />Exterior <br />Includes fencing and brick paving <br />$34,000 <br />Landscaping <br />Painting <br />exterior doors and frames <br />$6,000 <br />Atrium Renovation <br />$40,000 <br />General Conditions <br />includes all soft costs <br />$56,000 <br />Contingency <br />$40,000 <br />--------------- -- <br />TOTAL COST: <br />$752,600 <br />W11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.