My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 4 to PSA - Design Services for Olive Water Treatment Plant Improvements – Black & Veatch Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 4 to PSA - Design Services for Olive Water Treatment Plant Improvements – Black & Veatch Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:41:07 AM
Creation date
6/23/2020 1:55:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/23/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 4 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: June 12, 2018 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: Black & Veatch Corporation <br />d. Project: Hydraulic Modeling Training and Olive WTP Improvements Preliminary <br />Engineering <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />Task 402 — Design and Contract Document Development <br />The Engineer will prepare, develop and provide a signed and sealed design for a <br />new lintel and doorjamb based a change in the overhead door size that resulted <br />from the value engineering phase that occurred during bid negotiations. <br />Task 406 — Construction Administration <br />Additional responses to Requests for Information (RFIs) submitted by the Owner or <br />Contractor. The original scope included 10 RFIs. An additional 5 RFIs are <br />expected to be submitted by the Contractor resulting in a total number of 15 RFIs. <br />Task 408 — Shop Drawing and Submittal Review <br />Engineer will review additional shop drawings and other data submitted by the <br />Contractor as required by the Construction Contract Documents. The Engineer's <br />review shall be general conformity to the Construction Contract Documents for the <br />project and shall not relieve the Contractor of any of his contractural responsibilities. <br />Such reviews shall not extend to means, methods, techniques, sequences, or <br />procedures of construction or to safety precautions and programs incident thereto. <br />The original scope included 30 submitals/shop drawings. Based on the Contractor's <br />project submittal list an additional 37 submittals will require review resulting in a <br />total of 67 submittals and resubmittals to be reviewed for the project. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright C0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.