Opening of Quotes - West Bank Trail Timber Debris Removal Proj No. 120-041 - Ritschard Bros., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - West Bank Trail Timber Debris Removal Proj No. 120-041 - Ritschard Bros., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 1:24:32 PM
Creation date
6/23/2020 1:24:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/23/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
XII.LIQUIDATED DAMAGES <br />A.Prevailing Specifications: 2020,INDOT Standard Specifications Section 108 <br />B.Additions: <br />1.The contractor shall proceed with the work at such rate of progress to insure full completion within <br />the Contract Time. It is expressly understood and agreed, by and between the Contractor and the <br />Owner, that the Contract Time for completion of the work described herein is a reasonable time, <br />taking into consideration the average climatic and economic conditions and other factors prevailing <br />in the locality of the work, and excludes the time for unavoidable delays which were beyond the <br />control and without the fault of the Contractor. <br />2.Ifthe Contractor shall fail to complete the work within the Contract Time, orextension of time <br />granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages <br />a sum of five hundred dollars ($500.00) for each calendar day that the Contractor shall remain in <br />default after the time of completion stipulated in the Contract Documents. <br />3.The Contractor shall not be charged with liquidated damages or any excess cost when the delay <br />in completion of the work is due to the following and the Contractor has promptly given written <br />notice of such delay to the Owner and Engineer/Architect. <br />a.To any preference, priority, or allocation order duly issued by the Owner. <br />b.To unforeseeable causes beyond the control and without the fault or negligence of the <br />Contractor, including but not restricted to acts of God, acts of public enemy, acts of the Owner, <br />acts of another Contractor in the performance of a Contract with the Owner, fires, floods, <br />epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and <br />unforeseeable weather. <br />XIII.RETAINAGE AND FINAL PAYMENT <br />A.Prevailing Specifications: 2020,INDOT Standard Specifications Section 109 <br />B.Additions: <br />1.Payments will be made every thirty (30) calendar days <br />2.Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a percentage of <br />payments throughout the duration of the project. <br />3.Before final payment and retainage are released the Contractor must satisfy the following: <br />a.All parts and labor meet requirements stated in the specifications. <br />b.Providecopies of test reports orcut sheets on all materials supplied. <br />c.ProvideAs-Built drawings in accordance with the City of South Bend Prevailing Specifications <br />for Public Works. <br />d.One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final Waiver <br />of Lien. <br />XIV.WARRANTY <br />A.Prevailing Specifications: None <br />B.Additions: <br />1.All Parts shall include the following: <br />a.Performance specifications <br />b.Bill of Materials <br />c.Warranties on all parts <br />d.Installation and safety requirements <br />Version 2/14/2020Page -4Public Works Quote <br /> <br />