Laserfiche WebLink
5. List references from private firms for which you have performed work. <br />Gatlin_ Plumbing, & Heating,... -Inc 1-1,-11 E Main St,,., Griffith _IN„ Ms. Clara <br />Gough,, µInc 2200_E._88r''_Dr., errill_ville, IN46410_ Mr Ra,mond Gough ........ ....... ........ <br />Deer Construction Co , 1,7„16 Sheffield Avenue, Dyer, IN Janet Furman <br />..................................................... <br />Grimmer Construction Co., Inc. 261,9 Main Street Highland IN _Mr. Great Grimmer <br />.. <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />l . Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could <br />begin work, completed the project, number of workers, etc. and any other information which you believe would <br />enable the governmental unit consider your bid.) <br />As required by owner <br />2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have <br />performed part of the work) that you have used on public works projects during the past five (5) years along with a <br />brief description of the work done by each subcontractor. <br />See Attached List <br />3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be <br />used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a <br />listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed <br />project, you are under a continuing obligation to immediately notify the governmental unit in the event that you <br />subsequently determine that you will use a subcontractor on the proposed project. <br />Will supply upon award of contract <br />.......................................... <br />QUANTITY <br />ITEM <br />...... _ <br />DESCRIPTION, <br />CONDITION <br />YEARS <br />PRESENT LOCATION <br />SIZE, CAPACITY, <br />OF <br />- <br />_ <br />ETC. <br />..... ..... <br />SERVICE <br />............................_._............. <br />5 <br />Asphalt Plants <br />p <br />Various <br />Good <br />od <br />Griffith, South Bend, <br />......P .. <br />.As <br />.. <br />Valparaiso, Lowell, LaPorte <br />19 <br />ih alt Pavers <br />Various <br />Good <br />6Griffith South Bend <br />4 <br />Pav <br />S Paver <br />- .... <br />Various <br />Good <br />........ ............,. <br />Griffith, South Bend <br />... <br />3 <br />Road Widener <br />� _ <br />Various <br />.. ...... <br />Good <br />... ........... <br />Griffith South Bend <br />.... ...... .. <br />5 <br />.1 <br />Motor Graders <br />CAT/J.D. <br />Good <br />_ ......._ <br />Griffith, South Bend -- <br />56 <br />Rollers„ <br />Various <br />Good ._.. <br />..... <br />--- <br />Griffith. South Bend <br />......... <br />36 <br />Rubber Tire Loaders <br />Various <br />Good <br />Griffith, South Bend <br />.... ........._. 18._.. <br />Excavators ...,.,., .... <br />.V.................. �....� <br />_arious <br />_............. ..............._ <br />Good <br />.. ..__ <br />_..._ — ......___ <br />Griffith, South Bend <br />�............. ... .........mmm...... <br />9 <br />Bulldozers- ---- <br />....Various...... ....................Good <br />......... .............- <br />Griffith, South Bend <br />....... ........ ...._�..... .................. <br />7 <br />LowBoy Tractors <br />Various <br />Good <br />Griffith, South Bend <br />9 <br />1 ... <br />Flatbed Pumps <br />Various <br />_ ...... __ <br />Go <br />Good ..................mm......... <br />�. <br />Griffith, South Bend .. <br />' 3 <br />/2 and /ton Pickups <br />Various....... <br />d <br />Goo..... .. <br />... ............... <br />Griffith, South Bend <br />......,. mm........ ....... <br />_._..54 <br />78 <br />1 Ton Crew Trucks <br />Various <br />Good <br />Griffith, South Bend <br />3 <br />,Cold Planers..... ....... <br />.._ <br />Wirtgen 1900 <br />Good <br />— <br />Griffith, South Bend <br />DC <br />72 <br />Tri-Axle Dumb <br />Mack <br />Good <br />— <br />— <br />Griffith, South Bend <br />4. What equipment <br />do you have available <br />to use for the proposed <br />project? Any <br />equipment <br />to be used by subcontractors <br />may also be <br />required to be listed by the <br />governmental unit. <br />5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing <br />your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed. <br />Yes, we received quotes from potential subcontractors and suppliers <br />