My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Larson-Danielson Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Larson-Danielson Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 4:03:55 PM
Creation date
6/9/2020 4:02:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CATEGORY IV. The following classifications shall be paid an hourly wage of: <br /> <br />EFFECTIVE WAGES TOTAL PACKAGE <br />6-1-2018 to 5-31-2019 $36.83 $58.25 <br />6-1-2019 to 5-31-2020 $37.03 $59.75 <br />6-1-2020 to 5-31-2021 TBD $61.55 <br />6-1-2021 to 5-31-2022 TBD $63.05 <br />6-1-2022 to 5-31-2023 TBD $64.65 <br />Dynamite Men <br />Drillers air track or wagon drilling for explosives <br />Laborer Specialist <br />Asbestos removal <br />Hazardous waste removal <br />Lead based paint removal <br />Mold Remediation <br /> <br />CATEGORY V. shall include Watchmen and Gatemen (day or night) whose wage <br />rates and fringe benefit hours will be negotiated on an individual basis <br />by and between the Employer and the Local Union involved at the <br />pre-job conference. <br />CATEGORY VI. Shall cover Caisson and Tunnel Work in compressed & free air and <br /> the following classifications shall be paid an hourly wage of: <br /> <br />EFFECTIVE WAGES TOTAL PACKAGE <br />6-1-2018 to 5-31-2019 $37.33 $58.75 <br />6-1-2019 to 5-31-2020 $37.53 $60.25 <br />6-1-2020 to 5-31-2021 TBD $62.05 <br />6-1-2021 to 5-31-2022 TBD $63.55 <br />6-1-2022 to 5-31-2023 TBD $65.15 <br />Cage Tenders <br />Dump Men <br />Flagman, Signalman, Top Laborers <br />Rod Men <br />Concrete Repairmen <br />Lock Tenders (Pressure Side) <br />Motor Men <br />Muckers <br />Grout Machine <br />Track Layers <br />32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.