BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Seitz Park Reconstruction Phase 1
<br />Project Number: 117-093A
<br />For Bids Due: June 9, 2020
<br />Contractor Name:
<br />Northern Indiana. .......
<br />Construction Comoanv Inc.
<br />W51
<br />C-56
<br />i Bench
<br />5
<br />EACH
<br />1 ,830.00
<br />9,150.00
<br />C-57
<br />Bike Rack
<br />4
<br />EACH
<br />385.00
<br />1,540.00
<br />Type 5 Rail with Custom Infill Panel, 48
<br />_
<br />341
<br />.w.__._
<br />LFT
<br />119,350.00
<br />C-58
<br />inch
<br />350.00
<br />C-59
<br />Screen Fence
<br />61
<br />LFT
<br />400.00
<br />24,400.00
<br />C-60
<br />East Race Sign, Salvage and Reset
<br />1
<br />LSUM
<br />3,390,00
<br />3,390.00
<br />East Race Dedication Plaque, Salvage
<br />1
<br />LSUM
<br />545.00
<br />C-61
<br />and Reset
<br />545.00
<br />C-62
<br />Li hting, Pole, 1Oft
<br />4
<br />EACH
<br />3,360.00
<br />13,440.00
<br />C-63
<br />Foundation, Lighting
<br />8
<br />EACH
<br />800.00
<br />6,400.00
<br />C-64
<br />Lighting, Bollard T e L6
<br />6
<br />EACH
<br />2,480.00
<br />14,880.00
<br />C-65
<br />Luminaire, Type L1 ..
<br />4
<br />_ .... .
<br />EACH
<br />3,350.00
<br />13,400.00
<br />C-66
<br />Luminaire, Type L8
<br />4
<br />EACH
<br />600.00
<br />2,400.00
<br />C-67
<br />Handhole, Li htin�_
<br />1
<br />EACH
<br />650.00
<br />._
<br />650.00
<br />w. ......... _........................
<br />C-68
<br />Schedule 80 HDPE, 1.5 inch _
<br />390
<br />LFT
<br />6.20
<br />2,418.00
<br />C-69
<br />Schedule 80 HDPE, 2 inch
<br />70
<br />LFT
<br />6.60
<br />462.00
<br />C-70
<br />Wire, 3#8 No 10 AWG, Solid Co er
<br />250
<br />........ .......
<br />LFT
<br />.........
<br />2.80
<br />700.00
<br />C-71
<br />Wire, 2#12, No 12AWG, Solid Copper
<br />210
<br />LFT
<br />2.20
<br />462.00
<br />Mobilization and Demobilization for
<br />2
<br />EACH
<br />......_
<br />C-72
<br />Seedin
<br />400.00
<br />800.00
<br />C-73
<br />Topsoil
<br />__._ ..... .........
<br />....................................................
<br />42
<br />CYS
<br />61.60
<br />2,587.20
<br />C-74
<br />Sodding, Nursery
<br />382
<br />SYS
<br />12.55
<br />4,794.10
<br />C-75
<br />Excelsoir Blanket
<br />531
<br />SYS
<br />4.80
<br />2,548.80
<br />C-76
<br />Shredded Hardwood Mulch
<br />_.._._
<br />9�
<br />._.....
<br />CYS
<br />.. .........
<br />140.00
<br />1,260.00
<br />C-77
<br />Shrubs, No. 3 Cont.
<br />43
<br />EACH
<br />65.00
<br />2,795.00
<br />C-78
<br />Perennials, No. 1 Cont.
<br />395
<br />EACH
<br />. .... .....�......................... .._
<br />...... 17.00
<br />6,715.00
<br />C-79
<br />Ornamental Grasses, No. 1 Cont.
<br />132
<br />EACH
<br />17.00
<br />2,244.00
<br />C-80
<br />Planting Mixture
<br />52
<br />CYS
<br />150.00
<br />7,800.00
<br />.....----__.._....._
<br />C-81
<br />Metal Edging
<br />71
<br />LFT
<br />12.55
<br />891.05
<br />C-82
<br />Landscape Stone Mulch mm
<br />46
<br />.TON
<br />.,.eee.4.5.:......
<br />11,270.00
<br />C-83
<br />Irrigation System
<br />1
<br />LSUM
<br />1 28,600.00
<br />1 28,600.00
<br />DIVISION C TOTAL
<br />Version 4/2/2019 Contractor's Bid for Public Works - 13
<br />2,010,606.65
<br />
|