My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The sides will not form any portion of the fender compartments. <br />Upper and rear edges of side panels will have a double break for rigidity. <br />The upper inside area of the beavertails will be covered with brushed stainless steel to prevent damage <br />to painted surface when hose is removed. <br />Flooring of the hose bed will be removable aluminum grating with the top surface corrugated to aid in <br />hose aeration. The grating slats wjllbe .50" x 4.50" with spacing between slats for hose ventilation. <br />Hose bed will accommodate 1000' of 5" 200' of 1.75" 300' of 2.00" 600' of 2.50". <br />HOSE BED DIVIDER <br />Four (4) adjustable hosebed dividers will be furnished for separating hose. <br />Each divider will be constructed of a .125" brushed aluminum sheet fitted and fastened into a slotted, <br />1.50" diameter radiused extrusion along the top, bottom, and rear edge. <br />Divider will be fully adjustable by sliding in tracks, located at the front and rear of the hose bed. <br />Divider will be held in place by tightening bolts, at each end. <br />Acorn nuts will be installed on all bolts in the hose bed which have exposed threads. <br />A cross -divider will be provided just behind the fill tower. The divider will be bolted to the side sheet. <br />HOSEBED HOSE RESTRAINT <br />A red hosebed cover will be furnished with jacket snaps fasteners at the front and jacket snap fasteners <br />on the sides. <br />At the rear of the vinyl top cover will be a 2.00" red nylon webbing with a 1.50" x 4.00" box pattern. The <br />webbing will be connected at the top with a seat belt buckle on each side with a red tether on each seat <br />belt buckle. <br />The bottom of the webbing will loop through the footman loops located on the rear body sheet below <br />the hosebed. The straps will be connected at the bottom with 2.00" side release fasteners. <br />RUNNING BOARDS <br />Running boards will not be required on rear mount pumper. <br />TAILBOARD <br />The tailboard will also be constructed of .125" bright aluminum treadplate and spaced .50" from the <br />body, as well as supported by a structural steel assembly. <br />The tailboard area will be 18.00" deep and full width of the body. <br />The exterior side will be flanged down and in for increased rigidity of tailboard structure. <br />REAR WALL, BODY MATERIAL, PUC <br />The rear wall will be smooth and the same material as the body. <br />56 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.