BID/PROPOSAL,,��
<br />CITY OF SOUTH BEND`
<br />Project Name: Seitz Park Reconstruction Phase 1
<br />Project Number: 117-093A
<br />.............. ........... ........
<br />For Bids Due: June 9, 2020 ISO
<br />o on ruc ons Indiana n Northern or NthIdiCttimpany Inc.
<br />Contractor Name:
<br />__ ........... ......... ............
<br />B41 1 Cont. 46 EACH 30.00 1,380.00
<br />Perennials, No. �^^^ITIT-mmIT mm
<br />B-42 Planting Mixture 36 CYS 155.00 5,580.00
<br />B-43 Irrigation System 1 LSUM 33,430.00 33,430.00
<br />DIVISION B TOTAL 699,625.80
<br />DIVISION
<br />C — BASE BID
<br />Item
<br />No.
<br />Description e__..
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />C-1
<br />Remediation Allowance _.. .
<br />1
<br />LSUM
<br />$10,000.00
<br />........
<br />$10,000.00 _.....
<br />C-2
<br />Maintenance of Traffic
<br />1
<br />LSUM
<br />15 55.00
<br />15,355.00
<br />C-3
<br />. .
<br />......_..
<br />Permit Compliance Administration
<br />...
<br />1
<br />LSUM
<br />17,715.00
<br />17,715.00
<br />C-4
<br />Mobilization and Demobilization
<br />... _ _
<br />1
<br />LSUM
<br />83,110.00
<br />83,110.00
<br />C-5
<br />Barge and Barge Access
<br />1
<br />LSUM
<br />130,000.00
<br />.................... .....
<br />130.000.00
<br />C-6
<br />Construction Engineering
<br />1
<br />LSUM
<br />30,940.00
<br />30,940.00
<br />C-7
<br />Video Record
<br />...._ , _.... .. ....n_
<br />1
<br />LSUM
<br />2,500.00
<br />2,500.00
<br />C-8....
<br />......_...
<br />TemporaryErosion and Sediment
<br />Control
<br />�
<br />.M...
<br />22,775.00
<br />2. _..
<br />2,77500
<br />C-9
<br />Temporary Drop Inlet Protection
<br />2
<br />EACH
<br />345.00
<br />690.00
<br />C-10
<br />Construction Access Drive
<br />_._..... .__........... ....
<br />1
<br />EACH
<br />5,000.00
<br />C-11
<br />Temporary Tree Protection Fencing
<br />176
<br />LFT
<br />10.00
<br />__.._
<br />1,760.00
<br />C-12
<br />Clearin , Right of Way
<br />1
<br />LSUM
<br />148,135.00
<br />148,135.00
<br />C-13
<br />Sidewalk, Concrete, Removal
<br />153
<br />SYS
<br />35.00
<br />5,355.00
<br />C-14_
<br />Milling, Asphalt 1.5 Inch
<br />820
<br />SYS
<br />12.00
<br />9,840.00
<br />......
<br />C-15
<br />Wall, Concrete, Removal m..........
<br />90
<br />LFT_
<br />250.00
<br />22,500.00
<br />C-16
<br />Gabions,SelectRemoval��
<br />246
<br />CYS
<br />95.00
<br />23,370.00
<br />C-17
<br />Boardwalk Removal
<br />426
<br />SYS
<br />195.00
<br />__ ......
<br />83,070.00
<br />C-18
<br />Lighting Structure, Removal
<br />5
<br />EACH
<br />400.00
<br />2,000.00
<br />C-19
<br />Brick Paver, Removal/Salvage
<br />33
<br />...........
<br />SYS
<br />95.00
<br />3,135.00
<br />C-20
<br />Excavation, Common
<br />131
<br />CYS
<br />90.00
<br />11,790.00
<br />C-21
<br />Pipe, Type 4, 6 in
<br />... �...........
<br />52
<br />_ � ._u.
<br />LFT
<br />9.65
<br />501. 0
<br />C-22
<br />Aggregates for Underdrains
<br />2
<br />CYS
<br />_.......
<br />390.00
<br />780.00
<br />C-23
<br />...........
<br />Water Service, South Riverwalk
<br />_ ...
<br />1
<br />EACH
<br />.......
<br />10,050.00
<br />10,050.00
<br />C-24
<br />Riprap, Class 2
<br />260
<br />TON
<br />95.65
<br />24,869.00
<br />Version 4/2/2019 Contractor's Bid for Public Works - 11
<br />
|