Laserfiche WebLink
2. Mudroom — <br />a. Re -size and center window on north wall of mudroom to match symmetrically with new window <br />addition on south wall of mudroom. Both windows will be centered on the wall and match sunroom <br />windows in size and style. <br />3. Basement door — <br />a. Raise current basement door to provide access to elevated kitchen floor. <br />b. Remove current back door to kitchen with two new large windows on east wall to match windows on <br />north and south wall. <br />4. French door — <br />a. Install new in (or out) swing French doors <br />5. Bathroom — <br />a. Replace upstairs southeast window in location of new bathroom. Window is falling out of damaged <br />frame and does not close or open properly. Replacement window will be same size. <br />Proposed windows: Marvin Ultimate casement or double -hung, wood interior/aluminum-clad wood exterior. <br />Or Anderson Architectural Collection E -Series Casement window, wood interior/aluminum-clad wood exterior. <br />Proposed doors: Final brand and style to be determined. Materials will be wood or wood/aluminum (no steel or vinyl), <br />similar to: <br />Ashworth Professional Series wood/aluminum French doors <br />Or <br />Marvin Ultrex Outswinging French Door <br />SITE VISIT REPORT: N/A <br />STANDARDS AND GUIDELINES: CHAPIN PARK: Chapin Park Local Historic District <br />Il. EXISTING STRUCTURES <br />A. BUILDING MATERIALS <br />Original exterior building materials in the district include brick, stucco, clapboard, wood shingles, and brick or stone masonry. In <br />some instances, vinyl, composite and aluminum siding have been applied over the original material. <br />Required <br />Original exterior building materials shall be retained when possible. Deterioration of wood materials shall be prevented through <br />repair, cleaning and painting. The existing architectural detail around windows, porches, doors and eaves shall be retained or <br />replaced by replicas of the same design when deteriorated beyond repair. <br />Masonry, including brick and stucco structures, shall be maintained, and properly cleaned only when necessary to halt <br />deterioration or to remove stains and shall be done in a method acceptable for the preservation of the surface: i.e. low-pressure <br />water and soft natural bristle brushes. Brick or masonry mortar joints should be repointed only when there is evidence of <br />moisture problems, or when sufficient mortar is missing to allow water to stand in the mortar joint. Existing mortar shall be <br />duplicated in composition, color, texture, joint size, method of application and joint profile. <br />When repairing stucco, stucco mixture shall be used. A professional shall make a study of the old stucco, to determine the exact <br />mixture and underlayment used in the original work. Some repair methods are not compatible with the original techniques and <br />may cause early disintegration of the repair work and the original work. <br />Ample ventilation must be afforded the structure when siding is installed, in order to prevent increased deterioration of the <br />structure from moisture and insects. <br />Recommended <br />Whenever possible, the original building materials should be restored. When maintaining or repairing original siding is not <br />feasible, aluminum, vinyl or composite siding may be used. When used over wood surfaces, this siding should be the same size <br />and style as the original wood. Every effort should be made to retain the original trim around windows, doors, cornices gables, <br />eaves and other architectural features. <br />Property owners should contact the Historic Preservation Commission of South Bend and St. Joseph County prior to initiating <br />any restoration or rehabilitation effort. [ Address and contact information is listed in the front of the Guidebook.] The <br />Commission is an invaluable source of information about all facets of rehabilitation and restoration — materials, methods, <br />contractors and the like. <br />Prohibited <br />Wood siding shall not be resurfaced with new materials that is inappropriate or was unavailable when the building was <br />constructed, such as artificial stone, brick veneer, asbestos or asphalt shingles. <br />Sandblasting or the use of harsh detergents shall not be used on masonry including brick, stucco, limestone, flagstone and <br />sandstone. This method of cleaning erodes the surface material and accelerates deterioration. <br />Repointing shall not be done with a mortar of high Portland cement content which can often create a bond that is stronger than <br />the building material. Usage of Portland cement can cause deterioration as a result of the differing coefficient of expansion and <br />porosity of the historic masonry unit and the mortar. This most often results in serious damage to adjacent brick. <br />Unpainted masonry surfaces shall not be painted unless they had been painted originally. Paint shall not be removed from • <br />masonry surfaces by any means that damage the surface. <br />IN <br />