My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2018
>
May 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 6:39:53 PM
Creation date
6/8/2020 10:19:03 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P OCK Peacock & Company Standard Policy • <br />AND COMPANY <br />All work shall be completed in a workmanlike manner according to standard building codes and <br />practices. All labor and materials are fully warranted for two years from completion and final <br />payment. <br />AU alterations or changes to the above proposal involving additional costs, including changes at <br />the owner's request or hidden structural elements, mechanical deficiencies, or items that do not <br />meet code shall be executed only upon the signing of a written change order by the customer <br />agreeing to pay additional costs. Please be aware that hidden structural defects uncovered during <br />the demolition phase must be repaired for project completion. <br />Additional labor will be billed at $45.00 per hour; materials and subcontractors at cost plus 30% <br />to cover handling, arrangement and coordination. The terms of any change order(s) may not <br />coincide with the terms of the original agreement, while it is treated as an addition to the original <br />agreement. <br />Any excess, allowance items that are non -returnable, special order items will be included in <br />allowance totals. This usually occurs when an item needs to be rounded up to a case quantity (as <br />is common with tile). <br />Final balance upon completion payment overrides small, speciallcustom ordered items that are <br />not received at the time of final invoice. An interest rate of 2% will be applied toward all unpaid <br />balances (24% APR). <br />The customer is responsible for the cost of moving any utilities (electric, gas lines, meters) or • <br />installed systems (burglar alarms, sprinklers, etc.) if required unless exactly noted in the attached <br />proposal. <br />All agreements are contingent upon weather, strikes, accidents or delays beyond our control. <br />While we pride ourselves on remaining on schedule, please be aware that this is not always <br />possible. <br />The customer is responsible to carry fire, tornado, and other necessary insurance. All Peacock & <br />Co. employees are fully covered under Workman's Compensation Insurance. <br />During the course of the project we may be taking pictures and we would like permission to use <br />them in our display books and marketing efforts. We would also like to put up a "PEACOCK & <br />CO." yard sign. The sign is designed to help inspectors, delivery trucks and subcontractors to <br />locate the site, thus avoiding unnecessary delays. The sign also allows us to let passersby know <br />just how proud we are of the work we do and that you have entrusted us to work on your home. <br />Indiana Code 32-27-3 section 12. (a). states that the following notice must be conspicuous and <br />may be included as part of the underlying agreement signed by the homeowner. <br />"IC 32-27-3 contains important requirements you must follow before you may file a <br />lawsuit for defective construction against the contractor or builder of your home. Sixty <br />(60) days before you file your lawsuit, you must deliver to the contractor or builder, a <br />written notice of any <br />• <br />Initial <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.