My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2018
>
May 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 6:39:53 PM
Creation date
6/8/2020 10:19:03 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Historic Preservation Commission of South Bend & St. Joseph County <br />• <br />May 22, 2018 <br />• <br />0 <br /> Ia''I 'RRIM;1! <br />� iiil�wzm �� <br />Address <br />CoA# <br />Applicant <br />Proposed Work Description <br />1312 Lincoln Way E <br />2018-0309 <br />Anne Marie Pelino <br />"1. Remove and replace 21 windows with double - <br />hung thermopane replacement windows by Midway. <br />2. Remove and replace front door with Mastercraft <br />ME -214 Memphis 36"x80" exterior door. <br />Work to be completed in accordance with and <br />compliance with all applicable state required lead - <br />safe containment and abatement practices." <br />745 Leland Avenue <br />2018-0406 <br />Jonathan Keur <br />"Construct new 6' wood dog-eared privacy fence to <br />connect existing fence. Includes the addition of a <br />gate off the alley." <br />849 Forest Avenue <br />2018-0403 <br />Joan Downs <br />"Rehabilitation of existing structure, including: the <br />movement, replacement, addition, or removal of <br />windows and doors, the construction of a rear <br />addition enclosing the basement access, the addition <br />of two dormers to the second floor rear roofline, the <br />reconstruction of the front porch, site work to <br />accommodate the work, new pavers, new sidewalk. <br />For a comprehensive description of project items, see <br />attached." <br />1352 Lincoln Way E <br />2018-0315 <br />Tammie Winn <br />"Retroactive approval to install 4' chain link and 6' <br />wooden privacy fence enclosing property. Chain link <br />fence has additional rolling gate." <br />129 North Shore Dr <br />2018-0322 <br />Peter Bauer <br />"Remove Aluminum siding, restore wood details, <br />pilasters. Install trellis along front of house between <br />first and second stories. Continue window <br />rehabilitation work. Reconstruct porch, restore pillar <br />drums and bases, install new polystone Ionic capitals. <br />Replace K -style gutters with half -round gutters and <br />downspouts. Re -roof with synthetic slate tile." <br />504 Lasalle Avenue <br />2018-0404A <br />Greater Lowell <br />"Restoration, rehabilitation, reconstruction, <br />Holdings, LLC <br />alteration, and new construction of structures on <br />site. <br />See attached document for more detail." <br />701 Portage Avenue <br />2018-0402 <br />Amanda Shutts <br />"1) Replace existing 1/1 windows with new custom <br />1/1 windows by Lincoln (deferring to HPC staff when <br />questions arise). Exterior molding to be retained. <br />2) Replace garage door with commercial grade bi-fold <br />door. <br />3) Replace existing passage doors with custom mill <br />doors." <br />
The URL can be used to link to this page
Your browser does not support the video tag.