My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2018
>
March 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 12:27:44 PM
Creation date
6/8/2020 10:18:58 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3215 SUGAR MAPLE COURT, SUITE 13 • <br />SOUTH SEND, INDIANA 46628 <br />PHONE: 514-282-2998 FAX: 574-282-2994 <br />A SQUARE DEALTm SINCE 1968 <br />WWW.0RUMLISHAND0RUML1614.00M <br />1911 Talcott-Crumlish House, South Bend, IN <br />Interior renovation of historic home in Riverside Drive Local Historic District and originally design <br />by architect Earnest Young for Thadeus Talcott, then editor of the South Bend Tribune. [Construc- <br />tion completed 2005; this is the current home of Brendan Crumlish]. <br />1855 Trinity Episcopal Church, Niles, MI <br />Historically sensitive exterior masonry restorations and re -roofing work, and new interior handicap <br />restroom facilities. [Construction completed 1999]. <br />1910 United Methodist Church, North Liberty, IN <br />An historically sensitive new front entrance with handicap accessibility for church. [Construction <br />completed 2003] <br />1911 W.E. Newton Co. Building, San Angelo TX <br />An historically sensitive, partial interior office remodeling of an historic 4 -story furniture warehouse <br />in downtown San Angelo. [Construction completed 2010.] <br />Walnut Grove School, South Bend, IN <br />Schematic designs, cost estimates and project administration for relocation of historic 19th centu- <br />ry, one -room, wood schoolhouse, now used as an interpretative center for SBCSC students. [Con- <br />struction completed 1992] <br />Van Buren Center, South Bend, IN <br />Preliminary cost estimates, schematic designs and construction documents for remodeling of a <br />1930's neighborhood grocery store for a community meeting center. [Construction completed <br />2013.] <br />Ven! Candy Shop, Niles, MI <br />Design consultations for second floor alterations and marquee above an historic late 19th century <br />candy shop, [Construction completed 2009] <br />1888 Zion United Church of Christ, South Bend, IN <br />Feasibility study and cost estimates for rehabilitation and maintenance work on historic church and <br />Sunday school building. [Study completed 2008]. <br />is <br />7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.