My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2018
>
July 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 2:27:21 PM
Creation date
6/8/2020 10:18:47 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCOPE OF WORK <br />CITY OF SOUTH BEND <br />PROJECT NAME: Light Up South Bend — Riverside Lighting <br />PROJECT NO. 118-011A <br />QUOTES DUE July 10, 2018 at 9:00 am <br />PROJECT DESCRIPTION <br />45pU T1t g <br />Wi rewcr !a "� <br />A. The project includes the furnishing of all equipment, material, insurance, and labor to rewire the <br />historical lighting along Riverside Drive from Lafayette Boulevard to Leland Avenue, and along <br />Riverside Drive from Leland Avenue to Hudson Avenue. The wiring should be standard wire #4. The <br />Contractor shall supply a new Tesco Cabinet to be located at the alley between Park Avenue and <br />Forest Avenue on Riverside Drive. The existing light boxes shall be removed and salvaged, and new <br />boxes are to be installed. <br />II. PREVAILING SPECIFCIATIONS AND DESIGN & CONSTRUCTION STANDARDS <br />A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & <br />CONSTRUCTION STANDARDS, most recent version, are to be used on this project. <br />B. Each Quote provider is specifically instructed to become completely familiar with the most recent <br />version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS <br />prior to submitting a quote. <br />C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2018 <br />INDOT Standard Specifications for the letting effective after September 1, 2017. <br />D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING <br />SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. <br />E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, <br />the SPECIAL PROVISIONS will govern. <br />III. TERM "OR EQUAL" <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Where the term "or equal" is used in these specifications, the Quote provider deviating from <br />specified item shall file with his/her Quote a letter fully explaining and justifying his/her proposed <br />article or equal. The City of South Bend shall be the sole judge in determining if the "or equal" <br />offered meets the specification. <br />IV. TAX EXEMPT <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Materials and properties purchased under contract with the Owner that becomes a permanent part <br />of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). <br />The exemption number will be furnished to the Contractor upon award. <br />V. INDEMNIFICATION <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its agents, <br />officers and employees, from all costs, losses, claims and suits, including court costs, attorney fees, <br />and other expenses, arising from or out of the negligent performance of this Contract by Contractor, <br />or because of arising out of any defect in the goods, materials or equipment supplied by the Quote <br />provider. <br />Version 10/31/2017 Page - 1 Public Works Quote <br />11 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.