My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
April 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2018
>
April 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 6:12:49 PM
Creation date
6/8/2020 10:18:33 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Addendum to Certificate of Appropriateness <br />Joan Downs <br />908 Leland Ave. South Bend, IN 46616 <br />The windows at 908 Leland Ave. in South Bend which will be impacted by the renovation <br />described in the C. of A. application from March 2018 will be Marvin Ultimate Double Hung <br />Windows, all wood -clad. <br />We are in contact with Marvin Windows which is based in Wisconsin, to establish whether <br />they can simply take the Ultimate Double Hung Window and switch out the top cross piece <br />on the lower sash and the bottom cross piece on the top sash for a slightly smaller wooden <br />cross bar. The existing windows at 908 Leland have a 1 inch wide piece. The stock Marvin <br />Windows have a 2 inch wide piece. It appears that Marvin can semi -custom make the <br />windows we request in order to much more precisely match the existing and remaining <br />windows at 908 Leland. <br />• <br />• <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.