My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March 2017
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2017
>
March 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:18:15 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
uniformity between the upper and sunken beds. (See diagram.) This would also make the botanical area <br />more visible to drivers and pedestrians. <br />As an additional part of this connection of the beds, the entire Garden would be irrigated with a new, <br />timed, underground irrigation system, featuring a customized "drip" watering system for the somewhat <br />"fussy" roses; and a more traditional "sprayer head" system for the balance of the garden. This <br />irrigation would be invisible, except when actually running. <br />The Resurrect the Roses volunteers look forward to working with the HPC, and the Parks <br />Department to make this beautiful park area the botanical jewel that was originally intended. <br />Enc: Drawing <br />Respectfully <br />Resurrect the Roses at Leeper Park <br />Horticulture Curator <br />709 East Washington Street <br />South Bend, IN 46617 <br />574-850-1979 <br />larryc709@gmail.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.