My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
June 2017
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2017
>
June 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:18:09 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGTIVITY QTY. <br />Roofing 1 <br />Proposal #1: Reroof of main house with Ecostar imitation <br />slate <br />*Does not include porch or carriage port <br />-Remove existing roofing <br />thoroughly clean up/haul off/dispose of debris <br />-inspect decking for damage <br />-if decking needs replaced it will be done at a cost of <br />$16 per 10'-1 "x8" <br />-Install proper undedayments <br />-ice and water shield in valleys/on eaves/around <br />penetrations <br />-install #30 roofing felt on remainder <br />-Install copper drip edge on perimeters <br />-2" face/16 oz copper <br />-Install "w" style copper valleys <br />-16 oz. copper <br />-Install Ecostar brand imitation slate shingles <br />-these will be a blend of colors <br />these will be installed with stainless steel, ring- <br />shanked nails <br />-step flashings and counter flashings will be of 16 oz <br />copper as well <br />-new boots will be installed on pipes <br />-install copper hip and ridge caps <br />-maximum stretch out 16" on hip/ridge,a larger size <br />will be additional cost <br />Roofing 1 <br />Alt. #1: Installation of copper eave/gutter detail on main <br />house <br />-Fabricate and install copper eave detail <br />-a box style gutter will extend up from eave <br />approximately 22" (this will leave approx.18" exposed <br />copper from eave to imitation slate) <br />-heavy duty copper/brass straps will be installed to <br />firmly secure gutter <br />-these will be mechanically fastened and soldered <br />-all joints will be properly soldered <br />Total Cost $21,750 <br />RASE AMOUNT - <br />93,125.00 93,125.00 <br />21,750.00 21,750.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.