Laserfiche WebLink
PPLYjk, <br />LY GEM <br />Customer InformationCertified <br />BILL TO: 00046377 SHIP TO: 00046377 <br />WINDOWS <br />$11000.51 <br />$1,000.50 <br />Tim Morris <br />Big C Lumber South Bend Big C Lumber South Bend <br />30499 Tracy Rd <br />020830 020830 <br />Walbridge, OH 43465 <br />125 Dixieway North 125 Dixieway North <br />Phone: (800) 666-4343 <br />......,, # .�,. _.... <br />Fax: <br />South Bend IN 46637 South Bend IN 46637 <br />www.nlvaemwindows.com <br />574-272-6500 574-271-3832(Fax) 574-272-6500 574-271-3832(Fax) <br />,QUOTE DAT.Es' REQiJIiSEDDATE ; t SHIP#DATE_t; k ;_Q[10TEll�B mow, <br />Delivery: <br />,_-.. ,: z <br />3115527 <br />Comment: <br />11/21/2016 None Not Set matt.fields@bigclumber <br />- - .� ... •- . S.-__ ,^'_- - <br />JO$_1vA1VE ;'CTOMERSPO# y 3, t_ tiPLAPTTaF -. }�,; -�h_ SAI�ES_PERSOi <br />VS -S <br />Toledo Kinch, Nicholas <br />>�Descr`:i`tion <br />J1-1 <br />Rough Opening: 28 1/4 X 66 1/4, Overall Frame Size: 28 X 66 $333.50 $1000.50 <br />Qty: 3 <br />Product Contractor Series 2000 Replacement Double Hung <br />Room Location: <br />Special Product Request Glass Breakage Warranty = No glass breakage <br />None Assigned <br />warranty <br />Dimensions Frame Width = 28, Frame Height = 66, Sash Split = Even <br />Note: <br />Exterior Color/Finish = White, Interior Color/Finish = White <br />Operation / Venting (Viewed from Exterior) = Double Hung <br />Performance Rating = H -R15 (DP +151-15), U -Factor = 0.27 (1.53), SHGC <br />= 0.27, VLT = 0.5 <br />Glass HP2+, Double Glazed, Annealed, Low -E / Low -E, Argon Gas, <br />Warm Edge Spacer <br />Hardware White, 2 Locks <br />Full Screen, Charcoal Fiberglass Mesh, Center Bar <br />Frame Options Rigid Welded Nail Fin <br />Clear Opening: 23.424 X 26.26, Clear Opening Area: 4.271626 <br />Total Unit Quantity:3 <br />CUSTOMER SIGNATURE <br />DATE <br />Prices listed are good for acceptance for 30 days after the quote is certified. All material to be <br />delivered within an additional 90 days or pricing may be increased due to material cost increase. <br />Acceptance of the order by Ply Gem will be determined by availability of production time. Product <br />quoted may or may not meet architect's specifications. Please verify adherence to state and local <br />codes. Total does not include applicable taxes. Job total is reflected by the quantities SHOWN <br />ABOVE. In the event of quantity or extension discrepancy, unit price will prevail. <br />Quote #: 3115527 � PLy GEM Page 1 of 1 <br />Quote Effective Date: WITX vcrot,.- Printed: 11/21/2016 1:49:13 PM <br />Tv <br />$11000.51 <br />$1,000.50 <br />Tim Morris <br />Tim Morris <br />_ <br />={;.NOTES <br />......,, # .�,. _.... <br />Order: <br />Delivery: <br />Comment: <br />CUSTOMER SIGNATURE <br />DATE <br />Prices listed are good for acceptance for 30 days after the quote is certified. All material to be <br />delivered within an additional 90 days or pricing may be increased due to material cost increase. <br />Acceptance of the order by Ply Gem will be determined by availability of production time. Product <br />quoted may or may not meet architect's specifications. Please verify adherence to state and local <br />codes. Total does not include applicable taxes. Job total is reflected by the quantities SHOWN <br />ABOVE. In the event of quantity or extension discrepancy, unit price will prevail. <br />Quote #: 3115527 � PLy GEM Page 1 of 1 <br />Quote Effective Date: WITX vcrot,.- Printed: 11/21/2016 1:49:13 PM <br />