My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 2017
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2017
>
August 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:17:49 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Community School <br />Corporation <br />Feasibility S#ud.y <br />Marquette Primary Center --Option A4 <br />New 500 Student Capacity Expandable to 750 Montessori Magnet <br />Phase 1: Four Section K - 4 <br />combines two 960 SF traditional classrooms for a total of 1860 SF to form a <br />Monlessori classroom as compared to a typical Montessori classroom of <br />1500 SF. Instructional support areas such as art, music and media center <br />are increased in size to accommodate 750 students versus 500. Also, <br />building systems would be sized for future expansion and add to the initial <br />Phase 1 costs. <br />HEBARD & HEBARD Architects, Inc. <br />Hard Cost. Phase 2:$ 4,463,795 <br />Total Project: Phase 2:$5,669,019* <br />` Hard & Soft Costs <br />nage 16 <br />Highlicthts: <br />In Option A-4 the New 90,700 SF school would be built on the North end of <br />Curriculum: <br />Montessori <br />the site similar to Options A2 and A3. The Staff parking and playgrounds <br />Capacity. <br />Phase 1: 500 <br />would be located and configured further to the South of Phase 1 Construction <br />Phase 2: add 250 <br />to accommodate the Phase 2 addition. <br />K-4 <br />This option provides for a pair of traditional classrooms to be "opened" with <br />Area: <br />Phase 1: 90,700 SF <br />the removal of an internal wall and be converted to a single Montessori <br />phase 2: 31,400 SF <br />classroom. A future addition can be added to the south of the Phase 1 <br />building. <br />Hard Cost: <br />Phase 1:$16,061,940 <br />Note -- this added flexibility increases the building square footage because it <br />Total Project: <br />Phase 1:$20,398,663' <br />combines two 960 SF traditional classrooms for a total of 1860 SF to form a <br />Monlessori classroom as compared to a typical Montessori classroom of <br />1500 SF. Instructional support areas such as art, music and media center <br />are increased in size to accommodate 750 students versus 500. Also, <br />building systems would be sized for future expansion and add to the initial <br />Phase 1 costs. <br />HEBARD & HEBARD Architects, Inc. <br />Hard Cost. Phase 2:$ 4,463,795 <br />Total Project: Phase 2:$5,669,019* <br />` Hard & Soft Costs <br />nage 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.