My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2016
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2016
>
September 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:20 PM
Creation date
6/8/2020 10:17:43 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Estimate -Id: 63014 <br />Here are the wall configurations for your design, <br />Illustration May Not Depict All Options Selected <br />Gable Front View <br />—2'� TX 8' �10' <br />Eave Front View <br />(1) - <br />Pare 2 of 3 <br />61312016 <br />Gable Back View <br />-F f: �•-'`:. '�;=�""�`�` --- ..�- :?,-"�="=- Wig. �''-"`_-": <br />-.�.• 3=�:: ry ,.s� �,.��=� a:;3;L :��'.;< a �-�'�',J-�`-�'-�"`��"< <br />Eave Back View <br />(1) - <br />Building Size: 24 feet wide X 28 feet long X 10 feet high <br />Approximate Peak Height: 15 feet 5 inches (185 inches) <br />1#1p: Overhead doors may need to be "Wind Code Rated" depending on your building location. <br />Confirm the door requirements Oth your local zoning official before construction. <br />22'-6" <br />i 2'-6" <br />Menards-provided material estimates are intended as a general construction aid and have been calculated using typical construction methods. Because of the wide variability in codes and site restrictions, <br />all final plans and material lists must be verified with your local zoning office. Menards is a supplier of construction materials and does not assume liability for design, engineering or the completeness <br />of any material lists provided. Underground electrical, phone and gas lines should be located and marked before your building plans are finalized. Remember to use safety equipment including dust masks <br />and sight and hearing protection during construction to ensure a positive building experience. <br />
The URL can be used to link to this page
Your browser does not support the video tag.