My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March 2015
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2015
>
March 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:20 PM
Creation date
6/8/2020 10:16:55 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Area B (See Appendix A) <br />The following describes the proposed work that Indiana Michigan Power and/or it's <br />subcontractors are to perform in order to re -feed lights and service points in Leeper Park. All <br />work will be done as part of the Bartlett Street Improvements Phase I and Memorial North <br />Parking Lot Project. (City Project No. 114-032 and 114-047). <br />Two 4" conduits (electrical grade) will be installed perpendicularly across Park Lane from the <br />existing I&M Manhole C7-2 to a new above ground Pedestal, see attached photos, that is to be <br />located in Leeper Park approximately 10 to 15ft north of the existing curb. These two conduits <br />will be installed at a minimum burial depth of 36" and they will be concrete encased. The <br />Pedestal that is to be installed is approximately 29" by 16" and it will sit above the ground <br />approximately 24". In addition, we will install underground service wire from this new Pedestal <br />to the existing Pole and H -frame which are within a 15ft radius of the proposed Pedestal <br />location. These underground service conductors will be direct buried at a minimal burial depth <br />of 30". <br />In addition to the primarily underground work described above we will need to do some minor <br />tree trimming on the tree that is located just east and north of the existing I&M Pole. This <br />trimming will be required so that we can re -feed the street lights along Michigan St. with <br />overhead circuitry. <br />For the purposes of screening both the new Pedestal and existing utilities from the general <br />public in the park, a line of six 5 gal. evergreen shrubs (Taxus X Media — see photos) will be <br />placed approximately 5'north of the Pedestal. These shrubs typical grown to 3'-4' in height and <br />are described as an easily maintained hedge. <br />The disturbed area will be restored to its original condition. If any additional soil is required to <br />level out the area after compaction it will be done with topsoil. Once construction is complete, <br />all disturbed areas will be covered with new sod of the same type that is currently on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.