My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
March 2015
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2015
>
March 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:20 PM
Creation date
6/8/2020 10:16:55 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Part A (See Appendix A) <br />The following describes the proposed work that the awarded contractor is to perform in order <br />to connect the required storm sewer that is to be placed inside the new Memorial North <br />Parking Lot to the existing storm sewer network that currently goes through Leeper Park. All <br />work will be done as part of the Bartlett Street Improvements Phase I and Memorial North <br />Parking Lot Project. (City Project No. 114-032 and 114-047). <br />One 36" storm sewer pipe, approximately 29' long, will be placed from the existing structure <br />that currently sets on the north curb line at the intersection of Main Street and Park Lane to the <br />existing structure that sits approximately 20' North and 21.3' West of the existing light pole <br />near the same intersection. <br />This pipe will be approximately 3.5' deep from the existing ground to the top of the pipe. An <br />excavator will be required in order to remove the dirt from the area. Once the pipe has been <br />set, the hole will be filled in with the same material that was removed. The disturbed area will <br />be restored to its original condition. If any additional soil is required to level out the area after <br />compaction, it will be done with topsoil. Once construction is complete, all disturbed areas will <br />be covered with new sod of the same type that is currently on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.