Part A (See Appendix A) <br />The following describes the proposed work that the awarded contractor is to perform in order <br />to connect the required storm sewer that is to be placed inside the new Memorial North <br />Parking Lot to the existing storm sewer network that currently goes through Leeper Park. All <br />work will be done as part of the Bartlett Street Improvements Phase I and Memorial North <br />Parking Lot Project. (City Project No. 114-032 and 114-047). <br />One 36" storm sewer pipe, approximately 29' long, will be placed from the existing structure <br />that currently sets on the north curb line at the intersection of Main Street and Park Lane to the <br />existing structure that sits approximately 20' North and 21.3' West of the existing light pole <br />near the same intersection. <br />This pipe will be approximately 3.5' deep from the existing ground to the top of the pipe. An <br />excavator will be required in order to remove the dirt from the area. Once the pipe has been <br />set, the hole will be filled in with the same material that was removed. The disturbed area will <br />be restored to its original condition. If any additional soil is required to level out the area after <br />compaction, it will be done with topsoil. Once construction is complete, all disturbed areas will <br />be covered with new sod of the same type that is currently on site. <br />