Laserfiche WebLink
63" <br />7'-5" <br />AMERICAN ELECTRIC POWER COMPANY <br />DISTRIBUTION STANDARDS <br />21" : I t 54" :1 I i 21" -N <br />TROWEL <br />OUTSIDE EDGES WITH 2" MAX. <br />I INCH CHAMFER <br />PRIMARY--------\ <br />CONDUIT <br />NOTES 3 AM 4 <br />TRANSFORMER PAD <br />NOTES: <br />1, PROVIDE 3,500 PSI CONCRETE WITH A MINIMUM 3 INCH COVER <br />OVER ALL REBAR. WIRE MESH WITH A MINIMUM CROSS SECTIONAL <br />AREA OF 0.176 SQUARE INCHES PER FOOT OF PAD WIDTH MAY BE <br />USED IN PLACE OF REBAR, <br />2. THE NUMBER AND PLACEMENT OF CONDUITS TO BE DETERMINED BY <br />ENGINEERING. SECONDARY CONDUIT MAY EXTEND IN ANY DIRECTION <br />AS REQUIRED BY THE CUSTOMER. <br />3. PRIMARY CONDUIT NUMBER. SIZE. LOCATION AND DIRECTION TO BE <br />SPECIFIED BY ENGINEERING. CONDUIT CAN BE FLEXIBLE. TYPE EB <br />OR DB PVC CONDUIT WITH 9010, 35 INCH RADIUS BENDS.TO AVOID <br />DISTURBING THE GROUND UNDER THE REAR OF THE PAD AND TO <br />MINIMIZE SETTLING, BRING CONDUITS TO THE FRONT OR SIDES <br />WHENEVER POSSIBLE AND MARK THE CONDUIT END LOCATIONS. <br />TRANSFORMER PAD <br />JUPAD-C-3X-IK-PP I <br />�S REBAR <br />(60 KSI STEEL) <br />A <br />i l i T I I I T <br />I I <br />I <br />l I <br />L-I--i--I-�-I--�-I <br />I I <br />I--I-r-1-I---�--I- <br />I I I <br />-I- <br />I <br />I <br />I <br />#3REBAR(60 KSI)ATT <br />r I <br />_ <br />I- I <br />6" SPACING OVER ENTIRE PAD - <br />(EXCEPT AS NOTED R1 DETAIL "B") I -I <br />r -1 <br />L {_�_I <br />NOTE 1 <br />I_+_I_1_I_J <br />I <br />r -t -r -► <br />_I_ <br />I I I I I I I I <br />r I <br />L -1_L <br />-f -I <br />--I- I --I- f --I- i- <br />I I <br />I I <br />I I I I I II ! i I <br />I I <br />r - r-ri- <br />i i- i __- {- i I __ <br />I I I-I--r-I <br />4--I-4--1-+-ice +-I- <br />-I <br />31" 1= 23" <br />00 1 0000 <br />_I <br />` <br />I <br />I <br />PRIMARY 1 SECONDARY <br />_ -� <br />I <br />- <br />COMPARTMENT COMPARTMENT <br />NOTE 2 I NOTE 2( I <br />L I <br />L\---------------�I_1_i <br />L _ <br />L -- <br />TRANSFORMER FRONT <br />- - - _ - /-I_ <br />1 -1 <br />21" : I t 54" :1 I i 21" -N <br />TROWEL <br />OUTSIDE EDGES WITH 2" MAX. <br />I INCH CHAMFER <br />PRIMARY--------\ <br />CONDUIT <br />NOTES 3 AM 4 <br />TRANSFORMER PAD <br />NOTES: <br />1, PROVIDE 3,500 PSI CONCRETE WITH A MINIMUM 3 INCH COVER <br />OVER ALL REBAR. WIRE MESH WITH A MINIMUM CROSS SECTIONAL <br />AREA OF 0.176 SQUARE INCHES PER FOOT OF PAD WIDTH MAY BE <br />USED IN PLACE OF REBAR, <br />2. THE NUMBER AND PLACEMENT OF CONDUITS TO BE DETERMINED BY <br />ENGINEERING. SECONDARY CONDUIT MAY EXTEND IN ANY DIRECTION <br />AS REQUIRED BY THE CUSTOMER. <br />3. PRIMARY CONDUIT NUMBER. SIZE. LOCATION AND DIRECTION TO BE <br />SPECIFIED BY ENGINEERING. CONDUIT CAN BE FLEXIBLE. TYPE EB <br />OR DB PVC CONDUIT WITH 9010, 35 INCH RADIUS BENDS.TO AVOID <br />DISTURBING THE GROUND UNDER THE REAR OF THE PAD AND TO <br />MINIMIZE SETTLING, BRING CONDUITS TO THE FRONT OR SIDES <br />WHENEVER POSSIBLE AND MARK THE CONDUIT END LOCATIONS. <br />TRANSFORMER PAD <br />JUPAD-C-3X-IK-PP I <br />�S REBAR <br />(60 KSI STEEL) <br />� i I <br />-1--I <br />3" <br />DETAIL "B" <br />t <br />- FINAL GRADE <br />NOiE 5 <br />WELL COMPACTED CRUSHED <br />ROCK OR GRAVEL <br />SECONDARY/METERING CONDUIT <br />NOTE 4 <br />4. BURIAL DEPTH 15 DEFINED AS THE DISTANCE BETWEEN FINAL <br />GRADE AND THE TOP OF THE BURIED CABLE OR CONDUIT. <br />PRIMARY CABLES SHALL BE INSTALLED AT A BURIAL DEPTH OF <br />NOT LESS THAN 3'-0" AND SECONDARY CABLES SHALL BE <br />INSTALLED AT A BURIAL DEPTH OF NOT LESS THAN 2'-6". IT IS <br />RECOMMENDED THAT PRIMARY CABLES AND SECONDARY CABLES <br />MAINTAIN BURIAL DEPTHS OF 2'-6" AND 2'-0" RESPECTIVELY: <br />THE INITIAL 3'-0" AND 2'-6" BURIAL DEPTHS ARE TO ALLOW <br />FOR CHANCES IN SURFACE CONDITIONS, <br />5. FINAL GRADE SHALL BE ESTABLISHED BEFORE INSTALLATION OF <br />PAD. <br />CONCRETE PAD FOR THREE PHASE PAD -MOUNT TRANSFORMERS <br />112.5 kVA 1000 kVA, 120/208 VOLT <br />112.5 kVA 750 kVA, 277/480 VOLT <br />DECEMBER 15. 2010 25 kV AND BELOW D.S. 2020 <br />