My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 2013
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2013
>
July 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:16:05 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page I of I <br />Catherine I lostetler - 549 Edgewater <br />From: David Hoipkeniier <(Iavi(i.lioipkeinierCa;'giiiail.coni> <br />TO: <CHOs,rETI.,,C��,.co,st-.josepli.iii.tis> <br />Date: 81/5/2012 7:44 AM <br />Subject: 549 Edgewater <br />Catherine. <br />It looks like the porch project is going to be postponed for awhile. Is there a time constraint associated <br />with the approval of Historical Commission? <br />In terms of the specifies, our desire is to return to the original porch as much as possible. From what we <br />can tell, this will at least include removing the windows, the two layers of tile on the floor, and the <br />lowered ceiling. We anticipate replacing the pine TG floor boards and putting a stained bead board oil <br />the ceiling.'I'lic interior of the enclosed porch is entirely stucco, but we don't know how much ofthat is <br />original, ie was any of it brick, given the rest of the exterior. The enclosed porch also includes painted <br />trim and outlets, which need to be dealt with. A potential problem is the fact that though the center <br />supports for the house roof were riot there originally (on either side of the stone door), they may have <br />become structural over time and will need something to be there, part of the new porch. We don't <br />anything structural in the middle, but it may be required. <br />A more formal plan would need to be delayed until a later meeting wlien we will have a chance to do <br />niore investigation about Nvliat the original porch looked like. Is there a possibility that you could send us <br />a copy of the photograph that YOU fOlind? It might be helpful in figuring out the original look for the <br />interior porch wall. <br />We will be moving in and getting settled throtioli Labor Day in all likelihood, and will riot be able to <br />begin oil the porch specifically until after that. <br />Please let us know what you else you need in terms of gaining the Commission's approval. <br />gaining <br />David I-loipkemier <br />2 <br />fi1(n`iC-\Docurnents and Scititi(-,S,��.,,cliostetl*"I.-octI Settili,,,s\'*I.'ellip\�Xf,gii)wise� 501 E2474SJ(*.-... 8/61 012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.