Laserfiche WebLink
JIRST .� First Response DRS <br />' <br />CONTINUED - Attic 2 <br />73. Seal/prime then paint the walls and ceiling (2 coats) 342.74 SF <br />Room: Attic 3 Height: Peaked <br />Subroom 3: ROOM _9 Height: Sloped <br />Subroom 1: ROOM? Height: Sloped <br />Subroom 2: ROOM8 Height: Sloped <br />Appears unaffected. <br />Room: Exterior <br />74. R &R Corbel - wood - 2" to 4" wide w/ intricate detail <br />30.00 <br />EA <br />16 uppers and 7 lowers. <br />75. Seal & paint corbel - three coats <br />30.00 <br />EA <br />76. R &R Trim board - 1" x 10" - installed (pine) <br />464.00 <br />IF <br />Exterior soffit, 400 LF upper + 64 LF lower. <br />77. Prime & paint exterior soffit - wood <br />232.00 <br />SF <br />78. R &R Crown molding - wood - 5 1/4" <br />80.00 <br />LF <br />79. R &R Crown molding - wood - 3 1/4" <br />48.00 <br />LF <br />80. Precast crown molding with dentils <br />72.00 <br />LF <br />40 LF upper and 32 LF lower. <br />81. Seal & paint crown molding, oversized - three coats <br />200.00 <br />IF <br />82. R &R Trim board - 1" x 4" - installed (pine) <br />80.00 <br />IF <br />83. Seal & paint trim - two coats <br />280.00 <br />IF <br />84. R &R Fascia - 1" x 6" - #1 pine <br />80.00 <br />LF <br />85. Prime & paint exterior fascia - wood, 6% 8" wide <br />80.00 <br />LF <br />86. Seal & paint wood siding <br />400.00 <br />SF <br />Affected areas of siding. <br />87. R &R Metal roofing - Premium grade <br />60.00 <br />SF <br />88. R &R Porch or deck handrail w /turned balusters <br />48.00 <br />LF <br />89. Seal & paint balustrade - three coats <br />48.00 <br />IF <br />90. Finish Carpenter - per hour <br />40.00 <br />HR <br />Additional hours required to custom manufacture non - standard trim and handrails, including routing and shaping wood and building <br />handrails. <br />Have reviewed this line item and feel it is an accurate estimate of additional hours required. Will maintain detailed time cards/records <br />for review. <br />91. Scaffold - per section (per week) <br />16.00 <br />WK <br />8 sections for 2 weeks. Too many different skilled trades will be involved in exterior repair efforts to expect individual scaffolding <br />included in line item costs. <br />RANDALL & L1ND EHN1 7/25/2013 Page: 5 <br />