My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 2011
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2011
>
November 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:15:17 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br />Name: Mark & Elizabeth Adey Date: November 9, 2011 <br />Address: 1216 E. Wayne St., South Bend, IN <br />RE: Restoration of 1 window <br />Millwood Roofing and Construction Inc. propose to complete the following: <br />Scope of Work: <br />• Remove window <br />• Repair damaged frame <br />• Remove all paint <br />• 1 coat primer paint <br />• 2 coats exterior paint <br />• Make storm window to fit window <br />Respectfully Submitted <br />Marlin Miller <br />Millwood Roofing and Construction Inc. <br />Accepted By: <br />Labor and Material Total $ 2,475.00 <br />Date: <br />Millwood Roofing and Construction Inc. is pleased to submit a bid on this project and appreciates the opportunity. <br />We are fully insured and can provide an Insurance certificate upon being awarded the job. We provide a 10yr. Workmanship <br />warranty on our roof work. Estimate price is good for 30 days. After this time period, please contact our office to verify pricing. <br />A cancellation fee of 12% will be charged if contract is released/cancelled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.