My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2010
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2010
>
September 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:14:48 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EVERDRY WATERPROOFING SOLUTIONS <br />Option 1— Excavation Method <br />Outside Treatment (Surface Water) <br />10 Excavate to footer all accessible areas <br />'y Repair all wall cracksCLeveft <br />Seal Walls <br />Back FiUInside Treatment (Ground ik'afer) <br />u None (Not Applicable or Warranted)$ <br />Labor & Material <br />Ft Total Sq Ft (Grad <br />inSq <br />, X Lineal Ft <br />) Warranted <br />$ Per Sq Ft Cost <br />Option 2 — Insidedriternal Drains Method <br />Outside Treatment (Surface Water) <br />None (Not Applicable or Warranted) <br />Inside Treatment (Ground Water) 0 <br />Open floor next to outside walls ARa smlced <br />Drip weep holes at looter level w7liMlean Otlylyt W& <br />Install drain tile surrounded by gravel <br />Connect drain tile to crock with sump pump* <br />Replace concrete floor where opened t j f -' <br />$ Labor & Materials `� <br />Sq Ft Total Sq Ft (Lineal Ft <br />X Area Treated - 3 Ft) Wal ranted <br />$ $ Per Sq Ft Cost <br />* Sump Pump Covered Under Separve Manufacturer's Warranty Whicb Is 12-24 Months <br />1wit - , <br />Option 3 — Multi -Step Pressure Reiiefr"' Method <br />Outside Treatment (Surface WaterlSaturation PressurelFrost Neave Pressure) <br />Hand excavate inspection trench (where accessible) <br />Excavate and seal any cracks continuing below <br />inspection trench to their ends <br />Apply Fibrated Mastic (waterproofing) to walls <br />Apply heavy-duty industrial plastic to mastic <br />forming "Jr' channel0 <br />Install new sub -soil pressure relief drain the raw IV <br />packed in gravel Areasmkcd <br />Install heavy-duty plastic filter will be watranud: -h <br />Regrade <br />Floor"Walls de i utnp� <br />Cove seal any outside cement <br />Inside Treatment (Ground WaterlHydrostatic Pressure) <br />Open an inspection trench inside ; <br />Filter Wrap where necessary <br />Install Pressure Relief"' Tile ' <br />Ltstatt Pressure Relief^' Cylinder <br />Install Pressure RclieP Lid on top of Cyl' er K? <br />Install Pressure Reliefs" Pump** #t <br />Install Smart Power Backup System*" <br />Install Cove Plate+ l <br />Install EvercrctetD <br />\ Install E -Z Breathe' Ventilation System* « <br />Clean up and haul away debris <br />$ Labor & Materials <br />Outside Sq Ft (Grade Level R X Lineal Ft <br />Inside Sq Ft (Lineal Ft X Lineal Ft <br />�?,Sq Ft Total Sq Ft Warranted <br />$ $ Per Sq Ft Cost <br />*. tLifetime Warranty Offered on Pressure Relief- Pump, Ez-Breathe ventilation System and Smart Power Pump. <br />I have reviewc his documept wit inspector. All Proposals AfayBe WiAdrawn Withfn 30 Days <br />Signal Ix <br />Date <br />1 <br />1wit - , <br />Option 3 — Multi -Step Pressure Reiiefr"' Method <br />Outside Treatment (Surface WaterlSaturation PressurelFrost Neave Pressure) <br />Hand excavate inspection trench (where accessible) <br />Excavate and seal any cracks continuing below <br />inspection trench to their ends <br />Apply Fibrated Mastic (waterproofing) to walls <br />Apply heavy-duty industrial plastic to mastic <br />forming "Jr' channel0 <br />Install new sub -soil pressure relief drain the raw IV <br />packed in gravel Areasmkcd <br />Install heavy-duty plastic filter will be watranud: -h <br />Regrade <br />Floor"Walls de i utnp� <br />Cove seal any outside cement <br />Inside Treatment (Ground WaterlHydrostatic Pressure) <br />Open an inspection trench inside ; <br />Filter Wrap where necessary <br />Install Pressure Relief"' Tile ' <br />Ltstatt Pressure Relief^' Cylinder <br />Install Pressure RclieP Lid on top of Cyl' er K? <br />Install Pressure Reliefs" Pump** #t <br />Install Smart Power Backup System*" <br />Install Cove Plate+ l <br />Install EvercrctetD <br />\ Install E -Z Breathe' Ventilation System* « <br />Clean up and haul away debris <br />$ Labor & Materials <br />Outside Sq Ft (Grade Level R X Lineal Ft <br />Inside Sq Ft (Lineal Ft X Lineal Ft <br />�?,Sq Ft Total Sq Ft Warranted <br />$ $ Per Sq Ft Cost <br />*. tLifetime Warranty Offered on Pressure Relief- Pump, Ez-Breathe ventilation System and Smart Power Pump. <br />I have reviewc his documept wit inspector. All Proposals AfayBe WiAdrawn Withfn 30 Days <br />Signal Ix <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.