Laserfiche WebLink
City of South Bend <br />Diamond Avenue Trunk Storm Sewer <br />Project Description <br />For this project, the City will be installing a new trunk storm sewer down Diamond Avenue to <br />improve drainage and to remove storm water from the combined sewer system. During the <br />design process we asked the engineers to do some traffic and lighting and pedestrian/bicycle <br />facilities upgrades. <br />The following work will be performed in the Riverside Drive historic district: <br />• Install a roundabout at the intersection of Riverside/Angela. This will reduce pedestrian - <br />auto conflicts. <br />• The roundabout will move the Riverside/Angela intersection away from the bridge over. <br />the St. Joseph River, improving the sight distance and to create a a valuable public <br />park space along the river. Riverside will be shifted to the west to align with the new <br />roundabout. <br />• We are planning on installing a multi -path extension up the hill to Shetterly Park in the <br />future. <br />• Signage, lighting, and pavement markings will be improved <br />The city will also be upgrading the lights on the Angela Street bridge. This work was approved <br />by Historic Preservation in June 2003 under the permit application 2003-0616. The Certificate <br />of Appropriateness has been included in the information package. <br />Materials to be used <br />Please see the Project Drawings <br />